Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO5 AO5.1 N/A
Stormwater drainage infrastructure is aligned to avoid Stormwater drainage infrastructure avoids crossing
crossing waterways, wetlands, drainage lines and waterways, wetlands drainage lines and ecologically
ecological important areas, or where it is demonstrated this
is unavoidable, disturbed areas are reinstated and
important areas or follows the edge of existing disturbed
revegetated upon completion of works. areas.
AO5.2 N/A
Stormwater drainage infrastructure is co-located with
other infrastructure within a combined utility corridor
where appropriate.
AO5.3 N/A
Temporary vehicular crossings of waterways must be
designed and constructed to be consistent with the
current International Erosion Control Association Best
Practice Book Series.
Stormwater quality and protection of receiving waters AO6.1 Development will comply as
PO6 Stormwater runoff discharging into High Ecological Value Noosa Shire Council interactive
Development is located, designed, constructed and operated waters as a result of development causes no increase in mapping indicates the site is in an
to protect and enhance environmental values and water
gross pollutants, total suspended solids, total phosphorous environmentally significant area.
quality of waterways, wetlands, lakes, ground waters and
drainage systems. or total nitrogen compared to a pre-development scenario. Refer to Stormwater Management
Plan, in specific stormwater
AND quality section prepared by this
Editor’s note: Environmental values of waters and water office.
AO6.2
quality objectives are prescribed in Schedule 1 of the
Environmental Protection (Water) Policy 2009 and are
All stormwater runoff is treated to achieve maximum
identified on the State Planning Policy Interactive Mapping removal of nutrients, gross pollutants and suspended Development will comply, Refer to
System. solids as determined by cost to efficiency ratios. (e.g. Stormwater Management Plan, in
Page 4 of 12
June 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Site Based Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 34.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.