Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
Earthworks AO10 To be complied with at detailed design /
PO10 Filling, other than accessways: construction stages.
Excavation and filling for operational works only occur where
they: 1. does not extend more than the equivalent of 3
metres around the main building, measured
1. result in the protection, rehabilitation and repair from the outer walls of the building;
of ecologically important areas, watercourses, 2. is limited to a maximum of 500m2 and
drainage lines and wetlands; 3. does not impact on the local drainage of
2. do not adversely impact on the overall adjoining properties.
hydrology, hydraulics and flood capacity of
a waterway;
3. do not directly, indirectly or cumulatively cause
adverse impacts external to the site;
4. do not cause increased flooding, which
adversely affects the safety or use of any land
upstream or downstream;
5. do not cause ponding of water on the site or
nearby land;
6. do not result in a reduction in flood storage
capacity;
7. do not adversely affect the flow of water in any
overland flow path; and
8. do not adversely affect the privacy or visual
amenity of surrounding property.
Page 8 of 9
June 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Site Based Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 34.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.