Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (34.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                           COMMENTS
 Hazardous materials                                        AO11.1                                                        To be complied with at detailed
 PO11                                                       Materials manufactured or stored on site are not
 Development ensures that public safety and the                                                                           design / construction stages.
                                                            hazardous or noxious, or do not comprise materials that
 environment are not adversely affected by avoiding the     may cause a detrimental effect on the environment if
 release of hazardous materials into flood waters and the   discharged in a flood event.
 environment.
                                                            OR
                                                            AO11.2                                                        N/A no essential community
                                                            If a DFE is adopted, structures used for the manufacture or   infrastructure is proposed as part
                                                            storage of hazardous material are located above               of the development.
                                                            the DFE level.




Page 9 of 9
June 2021

Used in these records

About this file

File size
34.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Site Based Stormwater Managment Plan.pdf · 34.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.