Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (34.8 MB): may take a few minutes to open.
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
22366 C R10 R003 (04.07.22)
July 2022
Developable
Site Area
Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017)
Furthermore, review of Noosa Shire Council’s 2019 Draft Planning Scheme Policy Coastal Hazards mapping
indicates the subject site is located within an area subject to Sea Level Rise HAT inundation and Stormtide
inundation 1% AEP events. Refer to Appendix F for Council flood mapping plots regarding extents of the
above-mentioned inundation events.
4 STORMWATER INFRASTRUCTURE
4.1 Existing Infrastructure
A Noosa Shire Council DBYD search and detailed survey identified the following stormwater
infrastructure within the vicinity of the subject site:
Existing 1050mm stormwater pipe and associated gully pit traversing the southern portion of 94
Noosa Drive (Lot 203 on SP267424) and the existing Sanctuary Drive Road via kerb and channel
adapters to the north-east of the proposed extension;
Existing Council stormwater infrastructure consisting of 375-525mm stormwater pipes and gully
pits external to 142 Noosa Drive (Lot 3 on SP126203) within the south-eastern roundabout.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8 - Site Based Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 34.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.