Skip to the record
The only place to find full transcripts.

Council archive · source document

Attachment 8 - Site Based Stormwater Managment Plan · MCU22/0118

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (34.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                              RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads

                                                                                     22366 C R10 R003 (04.07.22)

                                                                                                       July 2022




                                                                  Developable
                                                                   Site Area




                     Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017)


Furthermore, review of Noosa Shire Council’s 2019 Draft Planning Scheme Policy Coastal Hazards mapping
indicates the subject site is located within an area subject to Sea Level Rise HAT inundation and Stormtide
inundation 1% AEP events. Refer to Appendix F for Council flood mapping plots regarding extents of the
above-mentioned inundation events.




4       STORMWATER INFRASTRUCTURE
4.1     Existing Infrastructure
       A Noosa Shire Council DBYD search and detailed survey identified the following stormwater
       infrastructure within the vicinity of the subject site:

           Existing 1050mm stormwater pipe and associated gully pit traversing the southern portion of 94
           Noosa Drive (Lot 203 on SP267424) and the existing Sanctuary Drive Road via kerb and channel
           adapters to the north-east of the proposed extension;

           Existing Council stormwater infrastructure consisting of 375-525mm stormwater pipes and gully
           pits external to 142 Noosa Drive (Lot 3 on SP126203) within the south-eastern roundabout.



BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                             Page 9

Used in these records

About this file

File size
34.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Site Based Stormwater Managment Plan.pdf · 34.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.