Attached to the e-mail SECOND PM Submission - Eric Ruben - 51983.3225.14.
8 APPOINTMENT OF BODY CORPORATE MANAGEMENT COMPANY ORDINARY RESOLUTION WITHOUT PROXIES Submitted by committee That the body corporate engages Body Corporate Services Pty Ltd for a term of 1 year(s) commencing on 1/08/2020 for a fee of $5,720.00 per annum inclusive of GST for the purpose of providing administrative services to the body corporate, and be authorised to exercise some or all of the powers of the executive committee, the details contained in the administrative agreement included with this notice AND FURTHER that the strata manager be authorised and instructed to affix the seal to the agreement witnessed by two (2) Committee members, one of whom must be the chairperson, or an authorised representative of Body Corporate Services Pty Ltd. RESOLVED that motion 8 be CARRIED Yes 23 Noo Abstain 0 Invalid 1 9 POOL HEATER ORDINARY RESOLUTION Submitted by committee That the body corporate agrees to either repair or replace the failing pool heater by selecting one of the following alternatives with the cost to be paid from the sinking fund. RESOLVED that motion 9 be CARRIED Yes 23 No 0 Abstain 1 Invalid 0 Alternative A Grosvenor Engineering Group to repair pool heater only at a cost of $4,487.57. Votes: 5 Yes Alternative B Heat Pump Systems to supply and install 45kw Thermoplus heat pump at a cost of $16,930.75 incl GST and all electrical costs. Votes: 18 Yes Alternative C Grosvenor Engineering Group to supply and install Rheem Thermal unit at a cost of $15,796.66 incl GST but excludes all electrical costs. Votes: 0 Yes As Alternative B received the majority vote, it was declared the Body Corporate’s decision. 10 PROPOSED SINGLE VILLA FOR LOTS 9 AND 10 ORDINARY RESOLUTION Submitted by owner Lot 9 and 10 R and P Holyman as company nominees The owners of Lots 9 and 10 request your approval to remove the current structures and replace with a new dwelling within the Council approved foot print. The concept sketch of which is attached with all costs to be met by the owners of Lots 9 and 10. Should permission be granted and subject to Council approval it is anticipated work would commence in February 2021. The owners undertake to meet all regulatory requirements and co-operate with the managers of the Hastings Beach Houses to ensure minimal disruption to other owners and guests. We will comply with any conditions stipulated by the committee in relation to the development. RESOLVED that motion 10 be LOST Yes 10 No 13 Abstain 1 Invalid 0 The owner of Lot 15 requested a poll be taken on the motion. In accordance with legislative requirements the poll count is 49 lot entitlements in favour and 53 lot entitlements against. Therefore the motion remains LOST, “THE HASTINGS” CTS 21433 AGM Friday, 29 May 2020 Page 6 = Scanned with CamScanner
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
Body Corporate Services Pty Limited ABN 82 010 120 144 Min th om i arnt goon soma, Strata ‘0 Box 450, Noosa Heads, QLD 4567 ‘Soman en COMMunity [email protected] tae“ austratias Horses ibn www. bessm.com.au OLD inanwer Body Corporate Services Ph, 07 5341 6500 Fax, 07 5509 6677 Minutes of the Extraordinary General Meeting of the Body Corporate for “THE HASTINGS” Community Titles Scheme 21433 held on 28 February 2020 at 11.00am at the office of Body Corporate Services, Suite 8, Noosa Central, 4-12 Bottlebrush Avenue, Noosa Junction, Qld. PRESENT IN PERSON R Leonard P and J Wellington G and H Proos M and K Hingston LOTS REPRESENTED Lot no 1 Holiday Management Noosa Pty Ltd by company nominee R Leonard 2 J and J Raftery by voting paper 3 K Samson by voting paper 4 P Treasure by voting paper 6 A Johnson by voting paper 7 Carasville Pty Ltd by company nominee P Holyman by voting paper 8 J Wellington 9 Carasville Pty Ltd by company nominee P Holyman by voting paper 10 Carasville Pty Ltd by company nominee P Holyman by voting paper 11. Carasville Pty Ltd by company nominee P Holyman by voting paper 12 ES Rubin Services Pty Ltd by company nominee E Rubin by voting paper 13. _N Gerlach by voting paper 15 G Proos by voting paper and in person 16 A Clark by voting paper 17 R Wadland by voting paper 18 JandN Voss by voting paper 19 Transmissions Brokers Pty Ltd by company nominee L Semple by voting paper 20 Hingston Properties Pty Ltd by company nominees M and K Hingston by voting paper 21 Consiliarius Septimus Nominees Pty Ltd by company nominees P and L Lumley by voting paper 22 A Payne by voting paper 23 P Kubat by voting paper 24 K Chapman by voting paper 26 Cammeray Investments Pty Ltd by company nominee L Westaway by voting paper 27 Bruna Dal Broi Pty Ltd by company nominee P Butler by voting paper 28 land M Stevens by proxy to E Rubin by voting paper 29 — Sticel Pty Ltd by proxy to P Kubat by voting paper IN ATTENDANCE Vivienne Hooper representing Body Corporate Services Pty Ltd. CHAIRPERSON OF MEETING Helen Proos chaired the meeting. PROXIES AND VOTING PAPERS The chairperson declared that the valid voting papers be accepted. QUORUM The chairperson declared that a quorum was represented and the meeting was declared open at 11.03 am. Scanned with CamScanner
Page 3
MOTIONS 1 CONFIRMATION OF MINUTES 2 21. 21.1 An Owner must ni which 21.2 In applying for approval, the Ow (a) (b) (c) (d) (e) (f) 21.3 In giving approval under this by-law, the Body Corporate ma ORDINARY RESOLUTION Procedural motion That the minutes of the annual general meeting held on Friday, Correct record of the proceedings at that meeting. RESOLVED that motion 1 be CARRIED Yes 22 No 0 31 May 2019 be confirmed as a true and Abstain 3 Invalid 1 NEW COMMUNITY MANAGEMENT STATEMENT SPECIAL RESOLUTION Submitted by J and J Raftery, R and P Holyman as company nominees, G Proos, R Wadland and L Semple as company nominee Lot no 2, 7, 9, 10, 11, 15, 17,19 That the body corporate consent to record a new community Management statement (CMS) that differs from the current CMS by amending Schedule C by: Inserting the following new Definition in by-law 1: Building Work — means any work relating to the demolition, construction or renovation of a Lot. Inserting the following new by-law 21: BUILDING WORK ON LOTS jot conduct any Building Work without the prior written consent of the Body Corporate shall not be unreasonably withheld subject to the following. ner must provide the Body Corporate with the following written information in relation to the Building Work: the scope (including concept plans, elevations, floor plans, shadow plans, landscaping plans); the intended duration; details of any expected excessive noise, disturbance, unpleasant odour or du st pollution (including the safe handling and disposal of asbestos material); the builder’s name, contact details and QBCC licence number along with all relevant insurance, be provided to the body corporate prior to commencemen . Proposed changes to common service connections or utility infrastructure (for exam ple, supply water, grey waste, sewer and waste water, fire detection and Monitoring services and electrical upgrades); if the Building Work includes structural changes to internal walls of the Owner's Lot, a full set of drawings showing the existing and proposed renovation certified by an engineer; Y impose reasonable conditions to address any potential risks to the Body Corporate and any potential impacts on other Owners in the form of the 15 conditions imposed on previous renovations including Lot 15 as follows: 1. All alterations, constructions and any associated works are to be completed by a competent tradesperson in a timely and professional manner, 2. All approvals from the Noosa Council or an authorised Certifier as applicable must be obtained by the lot owner and a copy supplied to BCS for the body corporate records before commencement of any works. 3. Any additional insurance cover which may be required to be added to the existing body corporate policy shall be notified by the lot owner and any additional premium paid before commencement of any works. 4. All principal contractor insurances including Public Liability, construction and workers comp to be supplied to the body corporate for its information for the body corporate insurer if required. 5. No construction works of any kind are permitted to be undertaken during weekends, public holidays or school holidays unless first granted permission in writing by the committee at hours solely acceptable to the committee and management. THE HASTINGS CTS 21433 Page 2 Scanned with CamScanner
Page 4
AA RR RALit IA aie Construction works of any kind are only to be carried out during M i Medann ly 9 Monday to Friday between the hours of 8 7 No jackhammerin: i i 9 OF Noisy construction works of any kind are to be undertaken before 1 Nontay ts Nich ore y en before 10 am or after 3 pm 8, Where Possible dust screens are to be installed or other suitable dust extraction system used to prevent dust travelling to and through other units and common property, 9 eureart must use their best endeavours to minimise all noise during construction including but not limited Not allowing foul language or allowing any music to be heard outside the lot and not to intrude on the privacy of other guests within the complex. 10. Lot owner or principal contractor must liaise with management and provide management with a schedule of Proposed works including expected start and c ‘ompletion dates. 11. Any Cleaning of common property required as a result of the works must be done at the end of each day to the satisfaction of management. 12. All equipment is to be stored out of sight at the end of each working day and is not to be left or stored on common property. It must be contained within the lot boundaries of the lot. 13. No Parking is permitted on site unless within the boundaries of the lot only. 14. No use of the body corporate driveway is permitted for deliveries of materials unless approved by Management prior to the delivery. 15. Any damage caused to common Property as a result of the works is the responsibility of the lot owner to €nsure rectification to the satisfaction of the body corporate. 21.4 In addition to any conditions the Bod ly Corporate imposes pursuant to by-law 22.3, 21.3 the following conditions also apply: Minimising disturbance to other occupiers (a) the Building Work is permitted to be carried out from 1 February to 15 December and between the hours of 8.00 am and 4.00 pm Monday to Friday. Work is not permitted on public holidays or during Queensland school holidays unless prior written agreement has been obtained from management. (b) the Owner must ensure its contractors comply with the following obligations: (i) compliance with the by-laws — all contractors are bound by and must observe all of the by-laws for the Scheme when on Scheme land; (ii) parking and access requirements -contractors’ vehicles must not be parked on Common Property without the prior written consent of the Body Corporate or in agreement with the Manager. (iii) equipment — no equipment may be stored or left on Common Property without the prior written consent of the Body Corporate; or in agreement with the Manager. (iv) _ waste - all waste must be removed from the Lot or stored out of sight at the end of each day. No waste may be deposited in the Common Property waste disposal bins or on any other part of the Common Property. The Owner must arrange for all waste to be disposed of offsite; (v) hosing — no hosing of any material onto Common Property including gardens and drains; (vi) damage — the Owner must arrange for the repair of any damage to or destruction of any part of the Scheme Land caused by or incidental to the Building Work. (c) the Owner must use all reasonable efforts to minimise noise, including but not limited to the closing of all windows and doors within the Lot; (d) the Owner must give at least 24 hours’ notice to the Manager of any work that may create a noise disturbance to other Occupiers; (e) at the completion of the Building Work, if dust, dirt, debris or other waste has impacted any other Lots or Common Property as a consequence of the Building Work, the Owner must arrange for a wash-down of those Lots or Common Property; THE HASTINGS CTS 21433 Page 3 Scanned with CamScanner
Page 5
Complia requi (f) the Owner must ensure its contractors are properly licensed, insured and satisfy all requirements of the current Work Health and Safety legislation and any other Requirements when conducting the Building Work; (g) the Owner must obtain all necessary permits and approvals for the Building Work and must provide copies to the Body Corporate within 7 days of receipt; (h) The Building Work must comply with all local Council town planning codes and requirements and must not: a increase the footprint of the existing dwelling; b. exceed the height of any existing dwelling on the property; & exceed allowable property boundary and set backs as defined by Council’s approval; d Colour scheme is to harmonise with existing e external building material is to harmonise with existing Indemnity (i) | the Owner must obtain and provide to the body corporate at his own expense a pre and post construction dilapidation report of all the body corporate common areas by a registered dilapidation engineer acceptable to the body corporate. 21.5 Where there is any significant change to the intended scope, duration or method of performance of any approved Building Works, the Owner must seek further approval from the Body Corporate. and that any two members of the committee be authorised to execute and affix the body corporate’s seal to the new CMS and do all things required to record the new CMS with the registrar of titles at the Department of Natural Resources and Mines within 3 months of the date this motion is resolved in favour. RESOLVED that motion 2 be LOST Yes 14 No 10 Abstain 1 Invalid 1 NOTE: For a motion to succeed under a special resolution it must succeed on all 3 criteria set down by legislation. 3 PROPOSED SINGLE VILLA FOR LOTS 9 AND 10 - THE HASTINGS ORDINARY RESOLUTION Submitted by R and P Holyman as company nominees Lot no 9 and 10 The owner of Lot 9 and 10 requests your approval to remove the current structures and replace with a new dwelling within the council approved footprint. The concept sketch of which is attached with all costs to be met by the owner of Lot 9 and 10. Should permission be granted and subject to Council approval, it is anticipated work would commence in February 2021. to meet all regulatory requirements and co-operate with the Manager of The Hastings Beach Houses in an effort to ensure minimal disruption to all other owners and guests and will comply with any conditions stipulated by the committee in relation to the development. Yes 11 No 13 Abstain 1 Invalid 1 en on the motion. In accordance with legislative requirements the our and 53 lot entitlements against. Therefore the motion The owners undertake RESOLVED that motion 3 be LOST The owner of lot 15 requested a poll be tak poll count is 52 lot entitlements in fav remains LOST. THE HASTINGS CTS 21433 Page 4 Scanned with CamScanner
Page 6
CLOSURE There being no further business the chairperson declared the meeting closed at 11.07 am. SECRETARY ERIC RUBIN c/- PO Box 450 Noosa Heads Qid 4567 THE HASTINGS CTS 21433 Page 5 Scanned with CamScanner
Page 7
e John Raftery addressed the meeting and spoke about reasonable and unreasonable decisions. He said the body corporate having already approved the amalgamation of the two lots may well be seen as unreasonable to not allow the lot owner to build on those lots within Council regulations. He did also say that technical issues within the proposed development may be reasonably objected to. * BCS also queried with the lot owner whether he would be prepared to enter into an agreement with the body corporate to stipulate the usual conditions applicable to any construction on lots. The lot owner advised he had no objection to this and was happy to work with the committee and owners to cause minimal disruption. The Chairperson determined there was no further discussion and the motion was put to the vote. 10 REPLACEMENT OF DWELLINGS ON LOTS 9 AND 10 ORDINARY RESOLUTION Submitted by owner Lot 9 and 10 R and P Holyman as company nominees The owner of Lot 9 and 10 requests your approval to remove the current structures and replace with a new dwelling within the council approved footprint, the concept sketch of which is attached with all costs to be met by the owner of Lot 9 and 10. should permission be granted and subject to Council approval, it is anticipated work would commence in February 2020. The owners undertake to meet all regulatory requirements and co-operate with the Manager of The Hastings Beach Houses in an effort to ensure minimal disruption to all other owners and guests and will comply with any conditions stipulated by the committee in relation to these works. RESOLVED that motion 10 be LOST Yes 13 No 14 Abstain 0 Invalid 0 The lot owner requested a POLL be taken of the votes. Following a calculation of the lot entitlements to form a POLL vote BCS announced the outcome as 48 entitlements voted YES and 56 entitlements voted NO. Therefore the motion remained LOST. NOTE FROM BCS BCS apologises as it was erroneously announced the outcome at the meeting as 48 entitlements voted YES and 50 entitlements voted NO. The calculation above in bold is correct and the outcome remains the same. “THE HASTINGS” CTS 21433 AGM Friday, 31 May 2019 Page 9 Scanned with CamScanner