Original source · versioned page text
AGM EGM Motion Results
Attached to the e-mail SECOND PM Submission - Eric Ruben - 51983.3225.14.
8 APPOINTMENT OF BODY CORPORATE MANAGEMENT COMPANY ORDINARY RESOLUTION WITHOUT PROXIES Submitted by committee That the body corporate engages Body Corporate Services Pty Ltd for a term of 1 year(s) commencing on 1/08/2020 for a fee of $5,720.00 per annum inclusive of GST for the purpose of providing administrative services to the body corporate, and be authorised to exercise some or all of the powers of the executive committee, the details contained in the administrative agreement included with this notice AND FURTHER that the strata manager be authorised and instructed to affix the seal to the agreement witnessed by two (2) Committee members, one of whom must be the chairperson, or an authorised representative of Body Corporate Services Pty Ltd. RESOLVED that motion 8 be CARRIED Yes 23 Noo Abstain 0 Invalid 1 9 POOL HEATER ORDINARY RESOLUTION Submitted by committee That the body corporate agrees to either repair or replace the failing pool heater by selecting one of the following alternatives with the cost to be paid from the sinking fund. RESOLVED that motion 9 be CARRIED Yes 23 No 0 Abstain 1 Invalid 0 Alternative A Grosvenor Engineering Group to repair pool heater only at a cost of $4,487.57. Votes: 5 Yes Alternative B Heat Pump Systems to supply and install 45kw Thermoplus heat pump at a cost of $16,930.75 incl GST and all electrical costs. Votes: 18 Yes Alternative C Grosvenor Engineering Group to supply and install Rheem Thermal unit at a cost of $15,796.66 incl GST but excludes all electrical costs. Votes: 0 Yes As Alternative B received the majority vote, it was declared the Body Corporate’s decision. 10 PROPOSED SINGLE VILLA FOR LOTS 9 AND 10 ORDINARY RESOLUTION Submitted by owner Lot 9 and 10 R and P Holyman as company nominees The owners of Lots 9 and 10 request your approval to remove the current structures and replace with a new dwelling within the Council approved foot print. The concept sketch of which is attached with all costs to be met by the owners of Lots 9 and 10. Should permission be granted and subject to Council approval it is anticipated work would commence in February 2021. The owners undertake to meet all regulatory requirements and co-operate with the managers of the Hastings Beach Houses to ensure minimal disruption to other owners and guests. We will comply with any conditions stipulated by the committee in relation to the development. RESOLVED that motion 10 be LOST Yes 10 No 13 Abstain 1 Invalid 0 The owner of Lot 15 requested a poll be taken on the motion. In accordance with legislative requirements the poll count is 49 lot entitlements in favour and 53 lot entitlements against. Therefore the motion remains LOST, “THE HASTINGS” CTS 21433 AGM Friday, 29 May 2020 Page 6 = Scanned with CamScanner
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.