Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published) · MCU24/0125
Reconfiguring a Lot Currency Period
2. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 4 September 2029,
unless an application to extend the currency period is approved by Council.
Operational Works Currency Period
3. This development approval lapses if the use has not happened by 6 September 2031, unless
an application to extend the currency period is approved by Council.
Preliminary Approval Condition 3 (3.1-3.4)
Prior to Council issuing a Development Permit, provide an amended Stormwater Management
Plan and associated Engineering Drawings that incorporates an allowance for climate change in
accordance with Performance Outcome 2 of the Water Quality and Drainage Code. The amended
package must include amendments to Engeny’s Stormwater Management Plan and associated
Engineering Drawings prepared by TOD Consulting, be prepared by a suitably qualified person
(RPEQ), and include in particular:
3.1 - allowance for a 20% increase in rainfall intensity by the year 2100 for all modelled scenarios
(10% and 1% AEP event);
3.2 - a revised assessment of non-worsening based on like-for-like scenarios for climate change
scenarios, based on the 1% AEP event (2100);
3.3 - revised internal site drainage drawings and calculations to include a climate change
allowance; and
3.4 - additional detail demonstrating how the “gap flow” has been calculated – nothing that Section
4.1 of the Stormwater Management Plan suggests that development flows in excess of the pipe
network fail to report to the existing bioretention basin in Ely Street.
Applicant’s Request
The applicant has requested Preliminary Approval Condition 3 be deleted.
TODs development engineers provided updated engineering and stormwater management plans,
incorporating minor modifications to the stormwater calculations sheet. It is also recognised there
are no requirements to increase any pipe sizes of the building.
Assessment of Request
Council’s Senior Development Engineer has had the amended Stormwater Management Plan and
associated Engineering Drawings peer reviewed by a suitably qualified third party.
As a result of this peer review, further changes were recommended by the third party engineer and
these changes with be integrated into an amended Stormwater Management Plan, which is
recommended to be provided to Council (by a condition of the development permit), prior to
requesting the required pre-start meeting associated with the Operational Works permit.
Recommendation
It is recommended Preliminary Approval Conditions 3.1-3.4 be deleted and the following condition
be imposed, requiring the applicant to submit the amended Stormwater Management Plan, prior
to requesting a pre-start meeting.
Recommended Condition
Prior to Council attending the prestart meeting, submit and have approved by Council, an amended
revision of Engeny’s Stormwater Management Plan (BBNE00529_0002_0001-REP-001-2) to
include the following amendments:
a. provide clarification on Section 4.1 with respect to the modelling of the proposed
detention tank within the townhouse site and gap flows that do not report to the existing
detention basin.
Page 11 of 39
Document Set ID: 23843933
Version: 14, Version Date: 05/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.