Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published) · MCU24/0125
Recommendation
It is recommended Preliminary Approval Condition 1.6 be deleted.
Confirm the methodology used to determine the proposed site cover shown on the proposal plans.
Specifically, why several portions of the built form of Units 1-5, 8, 10, 12-15, have been excluded
from the site cover calculation.
Preliminary Approval Condition 1.7
Where required, provide amended landscaping, reconfiguring a lot and operational works plans to
reflect any changes made to the proposal plans.
Applicant’s Request
The applicant has requested existing condition 1.7 be deleted.
All plans have been coordinated with updated changes to allow for the approval of all drawings as
part of the development permit.
Assessment of Request
In conjunction with the Amended Architectural Plans submitted, amended plans for landscaping
and engineering have been coordinated to ensure consistency. Also, the submitted reconfiguring
a lot plan (DA1.05) has also been updated (i.e. to Revision E).
Recommendation
It is recommended Preliminary Approval Condition 1.7 be deleted.
Where required, provide amended landscaping, reconfiguring a lot and operational works plans to
reflect any changes made to the proposal plans.
Preliminary Approval Condition 2
This development approval lapses if the requirements of the conditions have not been completed
and lodged with Council by 1 April 2027, unless an application to extend the currency period is
approved by Council.
Applicant’s Request
The applicant has requested Preliminary Approval Condition 2 be updated, when Council issue a
full Development Permit for this combined application for Material Change of Use, Reconfiguring
a Lot and Operational Works.
Assessment of Request
The currency period condition is to be revised to establish the relevant period, being:
- 6 years from the date of issue of the development permit for Material Change of Use aspect
of the development application.
- 4 years from the date of issue of the development permit for the Reconfiguring a Lot aspect
of the development application.
- 2 years from the date of issue of the development permit for the Operational Works aspect
of the development application.
Recommendation
It is recommended Preliminary Approval Condition 2 (Currency Period) be removed and new
relevant period conditions be included for each of the development permits in this combined
(MCU/RAL/OPW) application.
Material Change of Use Currency Period
1. This development approval lapses if the use has not happened by 4 September 2031, unless
an application to extend the currency period is approved by Council.
Page 10 of 39
Document Set ID: 23843933
Version: 14, Version Date: 05/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.