Council archive · source document
Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published) · MCU24/0125
Pedestrian and Bicycle Facilities
41. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with the condition of this approval, be generally in accordance with
TOD Consulting’s Roadworks and Stormwater Layout Plan (24572-C030, Rev. B) dated 30
April 2025 and must include in particular:
a. a 2.0 metre wide concrete footpath within the road verge for the entire length of the
site’s frontage to Eumundi Noosa Road.
Stormwater Drainage
42. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions of this approval,
be generally in accordance with the Approved Plans and the Queensland Urban Drainage
Manual.
43. Prior to Council attending the prestart meeting, submit and have approved by Council, an
amended revision of Engeny’s Stormwater Management Plan (BBNE00529_0002_0001-
REP-001-2) to include the following amendments:
a. provide clarification on Section 4.1 with respect to the modelling of the proposed
detention tank within the townhouse site and gap flows that do not report to the existing
detention basin.
b. provide clarification and justification on what climate change assumptions have been
adopted in Sections 4.2 and 4.3 and provide an amended non-worsening assessment
based on like-for-like scenarios, with respect to climate change assumptions, based on
the 1% AEP (2100) event.
c. provide justification on how the gap flows in Section 4.3 have been calculated (for the
total 1% AEP flow), if the calculations are based on WBNM modelling or TOD
Consulting’s stormwater calculations, and how the resulting flow reports in Starboard
Avenue during the 1% AEP event.
Roofwater Capture and Reuse
44. Each dwelling is to be provided with 2kL of roofwater storage for a combined total of 30kL
across the development in accordance with Blackwood’s Ground Floor Plan (DA2.04, Rev.
E) dated 1 May 2025. The roofwater is to be plumbed for reuse for non-potable fixtures such
as:
a. pool top-up;
b. landscape irrigation; and
c. other greywater uses.
Services
45. Underground reticulated electricity and telecommunication services must be provided to
each lot/unit in accordance with the standards and requirements of the relevant service
provider.
46. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
47. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
48. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
Page 20 of 39
Document Set ID: 23843933
Version: 14, Version Date: 05/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.