Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published) · MCU24/0125
34. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
LANDSCAPING
Landscaping Works
35. The development site must be landscaped. The works must be undertaken in accordance
with an Operational Works approval and the Noosa Plan for that specific area and must
include in particular:
a. the works shown on the approved landscape plans
b. vegetated screening of any electrical transformers, bin storage areas and the like from
the road frontage
36. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
ENGINEERING
External Works
37. Eumundi Noosa Road must be upgraded for the length of its frontage to the subject site. The
works must be undertaken in accordance with the conditions of this approval, be generally
in accordance with TOD Consulting’s Roadworks and Stormwater Layout Plan (24572-C030,
Rev. B) dated 30 April 2025 and must include in particular:
a. construction of kerb and channelling and underground stormwater drainage to the
development side only;
b. construction of a pedestrian footpath in accordance with the conditions of this Decision
Notice; and
c. removal of the existing property access and reinstatement of the kerb, footpath and
verge area to match the balance of the site frontage, including the provision of topsoil
and turf where the existing verge is grassed.
Site Access and Driveways
38. A sealed access driveway must be provided from Eumundi Noosa Road to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
the conditions of this approval, be generally in accordance with TOD Consulting’s Roadworks
and Stormwater Layout Plan (24572-C030, Rev. B) dated 30 April 2025 and must include in
particular:
a. a driveway crossover in accordance with RS-051.
Car Parking
39. A minimum of 34 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with the conditions of this approval, be generally in
accordance with TOD Consulting’s Roadworks and Stormwater Layout Plan (24572-C030,
Rev. B) dated 30 April 2025 and must include in particular:
a. 4 visitor parking spaces within the total, which are clearly marked for that purpose and
accessible at all times for visitor use;
b. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
40. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Page 19 of 39
Document Set ID: 23843933
Version: 14, Version Date: 05/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.