Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published) · MCU24/0125

of 39

Text shows just the words. Original shows the document exactly as it was published.

                      c.      Underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway
                      d.      Where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path.
                      e.      The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.
                      Earthworks and Retaining Walls
               33.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development, with geotechnical testing
                      undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as
                      defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
                      uniformity of fill shall be provided by a RPEQ and submitted to Council prior to Council signing
                      the Plan of Survey.
               34.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council.
               35.    Fall protection must be provided to retaining walls that are over 1m high.
               36.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies;
                      b.      1 in 4 for grassed areas;
                      c.      1 in 3 for planted areas; and
                      d.      1 in 2 for combined structural engineering and planting solutions.
                      Stormwater Drainage
               37.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               38.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g., by blocking or interfering with natural overland flows).
               39.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.
                      Erosion and Sediment Control
               40.    A ‘for construction’ Erosion and Sediment Control Plan (E&SCP) must be provided to
                      Council’s Delegate at least 2 weeks prior to the on-site pre-start meeting and prior to works
                      commencing. The E&SCP must:
                      a.      be prepared by a suitably qualified and experienced professional;
                      b.      be updated to reflect the current phase of the works (including clearing, earthworks,
                              civil construction, services installation and landscaping) and detail the type, location,
                              sequence and timing of measures and actions to effectively minimise erosion, manage
                              flows and capture sediment;
                      c.      be consistent with current best practice standards to the extent that the standards are
                              not inconsistent with the conditions of approval and taking into account all
                              environmental constraints including erosion hazard, season, climate, soil, and
                              proximity to waterways;
                      d.      provide sufficient detail regarding the manner in which compliance with all conditions
                              of this permit relating to E&SC is to be achieved;


                                                                                                       Page 30 of 39

Document Set ID: 23843933
Version: 14, Version Date: 05/09/2025

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published).pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.