c. Supervise and undertake necessary tree protection for all trees affected by the
development on neighbouring Lots. This includes tree identified in the approved
arborist report as outside project scope within the neighbouring properties east of the
development site. Where trees within neighbouring properties are found to be unsafe
due to works relating to this development approval, the developer is solely responsible
for the removal and replacement of these trees.
d. Oversee approved tree removal in proximity to retained trees.
e. Undertake a risk assessment of all trees on neighbouring properties affected by the
development within striking distance of the development works and site and carry out
hazard removal and amenity pruning in accordance with AS 4373, Pruning of amenity
trees.
*(Refer to Advisory Note)
Fauna Management
49. A qualified person* must be engaged to manage fauna prior and during clearing to:
a. Ensure works are carried out in accordance the Nature Conservation Act 1992.
b. Undertake pre-clearing inspections including fauna relocation and removal or blocking
of all vacant hollows.
c. Ensure clearing works avoids nesting times of animals and birds.
d. Co-ordinate staging and sequence of clearing with fauna protection.
e. Protect and recover fauna during clearing operations.
f. Manage the translocation of animals and recovery procedures in accordance with
relevant legislation.
g. Undertake protection works for mulching of any stockpiled vegetation.
*(Refer to Advisory Note)
Removal of Existing Trees and Vegetation
50. Removal of existing trees and vegetation must be undertaken by a qualified person* and
must include:
a. Stump grinding to below finished surface level.
b. Rectification to the finished surface levels and materials.
c. No damage to other vegetation for retention.
d. Legal disposal of all removed vegetation and debris.
*(Refer to Advisory Note)
Landscaping Works
51. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
52. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
53. Landscape works must:
a. Ensure amenity or sales signage and ancillary infrastructure (pavers or steppers) are
not installed within the road reserve.
b. Ensure permanent irrigation is not installed within the road reserve.
Page 34 of 39
Document Set ID: 23843933
Version: 14, Version Date: 05/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.