All stormwater collected from roofed areas should be directed to storage tanks for re-use. Overflow from
the tanks should be disposed of via connection to existing stormwater drainage or via rubble soakage
pits downslope of the dwelling.
No stormwater runoff should be allowed to flow over any exposed excavated embankment faces or filled
batters.
Areas adjacent existing gullies and existing dunal embankments must be protected against stormwater
scour.
All existing cross allotment flows from neighbouring properties must also be considered, managed and
maintained. Clear unhindered drainage paths must be provided and maintained during and beyond
construction. All constructed retaining walls must have effective drainage measures upslope and beyond
the walls. These drains must be maintained and flushed out regularly.
We have attached guidelines for hillside construction extracted from Australian Geomechanics vol. 35
March 2000 - "Landslide Risk Management". These references provide commentary on good design
and building practice.
lJ
We trust this meets with your requirements, however should you have any queries on the above matter
please gpntact the undersigned.
Yours s cer
Sean Richardson
For and on behalf of
SCG CONSULTING ENGINEERS
Encs Appendix A - Some Guidelines for Hillside Construction
Appendix B - Landslip Mechanisms
Appendix C - Landslip Risk Assessment Matrix
Appendix D - Site Plan
fl
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Application Forms REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 24.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.