LANDSLIDE RISK MANAGEMENT AGS SUB-COMMITTEE
APPENDIX A
SOME GUIDELINES FOR HILLSIDE CONSTRUCTION
GOOD ENGINEERING PRACTICE POOR ENGINEERING PRACTICE
ADVICE
gcctLdinica! cat<, ili.i rat ear! P' a And s.., ,,,..locks bcfixc
1 tics '. ! ,ax of am r z a oc rcnn..al a!
PLANNING
aving obtained georec'nical advice, plan the development with the risk Plan development without regard for the Risk
I arising Gam the identified hazards and consequences in mind.
DESIGN AND CONSTRUCTION
I IOL'SC DES; : Y.I Use t cA:;;k ;truuures which incorporate properly designed brickwork, timber Floor plans which require extensive cutting and
or steel frames, timber or panel cladding. filling.
Considcr use of split levels. Movement intolerant structures.
Use decks for recreational areas where appropriate.
SITE CLEARING Retain natural vegetation wherever practicable Indiscriminately clear the site.
ACCESS & Satisfy requirements below for cuts, fills, retaining walls and drainage Excavate and fill for site access before
ORIYEWAYS Council specifications for grades may need to be modifie(i geotechnical advice.
Drivewsv and parking areas may need to be fully supported on pliers.
EARTHWORKS Retain natural contours wherever possible Indiseriminant bulk earthworks.
CUTS Minimise depth Large scale cuts and benching.
Support with engineered retaining walls or batter to appropriate slope. Unsupported cuts.
Provide drainage measures and erosion control. Ignore drainage requirements
Ftt1S Minimise height Loose or poorly compacted fill, which if it fails.
Strip vegetation and topsoil and key into natural slopes prior to filling. may nnw a cnnsidera^!c dint=ice ineitatittg
Use dean nth materials and compact to engineering standards onto property below.
Batter to appropriate slope or support with engineered retaining wall. Block natural drainage lines.
an opsot
Include stumps, trees, vegetation, topsoil,
boulders, building rubble etc in fill. _
Roctc OUTCROPS Remove or stabilise boulders which may have unacceptable risk. Disturb or undercut detached blocks or
& BOULDERS Support rock faces where necessary. boulders.
RETAINING Engineer design to resist applied soil and water forces Construct a structurally inadequate will. such as
WALLS Found on rock where practicable. sandstone flagging, brick or unreinfurced
Provide subsurface drainage within wall backfill and surface drainage on slope blockwork.
above. Lack of subsurface drains and wcepholes
Construct wall as soon as possible after cut/fill operatiorL
E' )fr:` ;C-S Found within rock where practicable. •,:n.! . _-; ,; -,
Use rows of piers or strip footings oriented up and down slope.
Design for lateral creep pressures if necessary.
Backfill footing excavations to exclude ingress of surface water.
SWiivIM NG POOLS Engineer designed.
Support on piers to rock where practicable.
Provide with under-drainage and gravity drain outlet where practicable.
Design for high soil pr:--.u-ex which may develop on uphill side whilst there
may be little or no lateral support on downhill side _
DRAINAGE
P J SuRFACe Provide at tops of cut and rill slopes. Discharge at top of fills and cuts.
Discharge to street drainage or natural water courses. Allow water to pond on bench areas
Provide general falls to prevent blockage by siltation and incorporate silt traps.
Line to minimise infiltration and make flexible where possible.
Special structures to dissipate energy at changes of slope and/or direction.
SUBSURFACE Provide filter around subsurface drain. Discharge roof runoff into absorption benches.
Provide drain behind retaining walls.
Use flexible pipelines with access for maintenance
Prevent inflow of surface water.
Se.o is & ! rsualy reqt_irsss pu.:.p-c:t or mains setter systems; absorptions trenches may :itsc'1srge silage onto and into slopes
St1LLAoe be possible in some areas if risk is acceptable. Use absorption trenches without consideration
Storage tanks should be water-tight and adequately founded of landslide risk.
EROSION Control erosion as this may lead to instability. Failure to observe earthworks and drainage
CON i ROL & Revegetate cleared area. recomnxndations when landscaping
I.ANI).SC'APING
DRAWINGS AND SITE VISITS DURING CONSTRICTION
Building Application drawings should be viewed by geotechnical consultant
SITE VISITS Site Visits by consultant may be appropriate during construction/ I
INSPECTION AND:1lAlNTENA:NCE BY OWNER
OWNER'S Clean drainage systems repair broken joints in drains and leaks in supply
RES!'ONSIBILITY pipes
'.Vrrrn,.ric i s d. ,-tress is _dsi._
I f xopa olr. ,c r. J e._. r "n-= "1'
Australian Geomechanics - March 2000 91
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Application Forms REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 24.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.