Council archive · source document
Development Application part 2 Application Forms REC11/0145
Very large file (24.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
LANDPARTNERS
Erosion and Sediment Control Code
column i column 2
Specific Outcomes Probable solutions rif wale assessable)
14.125 Effects of works
Erosion and sediment control S1. 1 Site disturbance is limited to building
01 Development minimises erosion and areas, their surrounds and other use areas;
transport of sediments off-site. AND
51.2 Sediment barriers are provided
throughout and downslope of disturbed
areas to prevent sediment washing into
gutters, drains and watercourses either on
or off the site;
AND
S1.3All stockpiles including sand, soil or
building materials are within the premises
and contained within individual sediment
barriers;
AND
51.4 Sediment basins are provided where
the site contains fine or dispersive soils;
OR
S1.5A stormwater catchpit incorporating a
ctnrmwnter rntrhpit protection device is
installed so that all runoff from disturbed
areas flows to the catchpit;
AND
51.6 For buildings,
o) temporary or permanent downpipes
are connected to the stormwater
system before laying the roof; or
b) localised erosion is avoided by
directing flow from downpipes over
non-erosive areas.
Compliance
S1.1 Complies - No soil disturbance other than serving trenches is proposed.
S1.2 Complies - Sediment barriers can be appropriately conditioned.
S1.3 Complies - Sediment barriers can be appropriately conditioned.
S1.4 Not Applicable- Sediment basins are not appropriate in this instance.
Si .5 Not Applicable- A stormwater catchpit is not appropriate in this instance.
Si .6 Not Applicable No building is proposed.
Storm water runoff 52.1 Diversion drains or bunds are
O2Stormwater is diverted around disturbed designed and constructed to drain
upstream run-off around the disturbed site;
areas.
AND
52.2 Discharge from the diversion drains
do not cause run-off impacts to other
properties;
OR
S2.3AIternative methods, as described in
the Institution of Engineers Australia
(Queensland Division) Soil Erosion and
Sediment Control - Guidelines for
Queensland Construction Sites, are used
Compliance
S2.1 Complies - There will be minimal soil disturbance proposed as part of the development and
diversion drains can be conditioned is considered necessary.
S2.2 Complies - This can be appropriately conditioned.
A2.3 Complies - This con be appropriately conditioned.
BRSS6220.000 Report for Lodgement 46
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Application Forms REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 24.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.