Council archive · source document
Development Application part 2 Application Forms REC11/0145
Very large file (24.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
LANDPARTNERS
O8Stormwater drainage infrastructure is S8. I Stormwater drainage planning, design
planned, designed and constructed to- and construction is in accordance with
a) be accessible, cost effective and easily Section 4 of PSPS Engineering Design
maintainable; Standards - Roads, Drainage and Earthworks;
b) protect downstream capacity; AND
c) protect downstream water quality; S8.2As Constructed data is submitted in
d) maximise on-site stormwater retention and accordance with Section 6 of PSP5
retardation; and Engineering Design Standards - Roads,
e) convey run-off to stormwater drainage in a Drainage and Earthworks;
manner that allows roads to be trafficable in AND
Q100 ARI local rainfall events. S8.3Stormwater drainage planning, design
and construction is in accordance with the
Queensland Urban Drainage Design
Manual.
Compliance
S8.1 Complies - The stormwater drainage will be designed and constructed in accordance with
section 4 of the PSP5 Engineering Design, Standards - Roads, Drainage and Earthworks.
S8.2 Complies - As constructed data will be submitted in accordance with section 6 of PSP5
Engineering Design Standards - Roads, Drainage and Earthworks.
S8.3 Complies - Stormwoter drainage planning, design and construction is in accordance with the
Queens/and Urban Drainage Design Manual.
09 Roads and stormwater drainage S9.1 Roads and stormwater drainage
_^ astrurture s cnnstructPrt in nrrarrtnnrp
a) in accordance with appropriate engineering with-
standards; and a) Sections 2, 3 and 4 of PSP5
b) to minimise adverse environmental impacts, Engineering Design Standards -
including from run-off and erosion. Roads, Drainage and Earthworks;
b) Queensland Design Code for
Residential Streets;
c) AUSTROADS,; or
d) A combination of the principles in
these documents;
AND
59.2 Erosion and sediment control
measures are designed and implemented in
accordance with the Institution of Engineers
Australia (Queensland Division) Soil Erosion
and Sediment Control - Guidelines for
Queensland Construction Sites.
Compliance
09 Not Applicable - No roads are proposed as part of this development application.
Environmental Protection 510.1 Roads and stormwater drainage
010 Roads and stormwater drainage follow the edge of existing disturbed areas, or
infrastructure alternatively, these works are co-located
are located and aligned so as to- within a combined utility corridor;
a) minimise disturbance to native vegetation AND
and/or other habitat areas; 510.2 Roads avoid native vegetation and
b) protect and maintain wildlife corridor provide for fauna underpasses and
movements and the safety of native fauna; associated fencing where appropriate;
c) minimise changes to the hydrological regime, AND
including drainage patterns, run-off and water 510.3 Road infrastructure within or adjacent
quality; to native habitat incorporates fences which
d) avoid crossing watercourses, drainage lines allow for protected wildlife movement and
and wetlands, but where such crossings are controls unrestricted access of domestic
unavoidable, disturbed areas are reinstated cats and dogs;
and revegetated on completion of works; and AND
e) minimise bulk earthworks. 510.4 Native vegetation is protected from
BRSS6220.000 Report for Lodgement 53
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Application Forms REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 24.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.