Council archive · source document
Development Application part 2 Application Forms REC11/0145
Very large file (24.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
/^ LANDPARTNERS
clearing or construction activities by-
a) clearly marking vegetation to be
retained with flagging tap;
b) installing protective fencing around the
dripline of vegetation; and
c) ensuring stock piling, storage and
vehicle parking occur outside the areas
of vegetation to be retained;
AND
510.5 Low impact construction techniques
are used around areas of vegetation to be
retained to minimise interference with the
vegetation.
Compliance
S10.1 Not Applicable - No roads are proposed as part of this application.
510.2 Not Applicable - No roads are proposed as part of this application.
S10.3 Not Applicable - No roads are proposed as part of this application.
510.4 Not Applicable - No roads are proposed as part of this application. Native vegetation
0 proposed for retention will be protected using the above methods.
510.5 Not Applicable - No construction is proposed.
011 Roads and stormwater drainage No solution provided
infrastructure is proven to be suitable for its use
Compliance
011 Not Applicable - To this application.
012Alignment of stormwater drainage 512. 1 The location, design and construction
infrastructure is to allow for easy access for the of stormwater drainage structures is in
ongoing maintenance by Council. accordance with Sections 4 and 5 of PSF5,
Engineering Design Standards - Roads,
Drainage and Earthworks;
AND
512.2 Where infrastructure is located on
private land an easement is dedicated over
the infrastructure in accordance with Section
4 of PSP5, Engineering Design Standards -
11 Roads, Drainage and Earthworks.
Compliance
512.1 Complies - Stormwater drainage will be constructed in accordance with section 4 & 5 of the
PSP5. The Engineering Assessment has been included within Appendix H, which details the intended
method of stormwater discharge through roof water pits and pipe along the rear boundary of the
proposed new allotments.
S12.2 Complies - Any infrastructure on private land will be covered by an easement in accordance
with PSP5.
14.148 Frontage works
013 Development is provided with external 513.1 The following infrastructure
roadworks along the full extent of the frontage of components already exist at the frontage of
the site to an appropriate standard having the site or are provided at the developer's
regard to the specified function of the road. expense-
a) full width sealed road;
b) concrete kerb and channel where
appropriate;
c) forming and grading to footpaths;
d) vehicular kerb and footpath crossings;
e) a constructed bikeway;
f) a constructed footpath;
g) a constructed carriageway;
BRSS6220.000 Report for Lodgement 54
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Application Forms REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 24.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.