Council archive · source document
Development Application part 2 Application Forms REC11/0145
Very large file (24.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
LAND PARTNERS
h) required alterations to public utility
mains, services or installations;
i) construction of any required alterations
to public utility mains, services or
installations;
j) stormwater drainage works; and
k) installation of electrical conduits;
AND
513.2 Road and drainage design and
construction is in accordance with Sections
3 and 4 of PSP5 Engineering Design
Standards - Roads, Drainage and
Earthworks.
Compliance
S13.1 Complies - The proposal is for an infill subdivision and contains a frontage to Council's
standards.
S13.2 Complies - No road is proposed as part of this application.
14.149 Road and rail corridors
014 Noise sensitive uses including residential 514.1 Noise sensitive uses including
uses are not subjected to high traffic noise levels residential uses are separated by a
from the major road network or rail corridors. minimum of-
a) 40m from the property boundary of
and
b) 80m from the property boundary of rail
corridors;
OR
514.2 Development in the vicinity of road
corridors meets the following external design
criteria for roads in the major road network-
a) 54dB(A)L10 (18hours) based on predicted
traffic volumes ten years hence;
AND
514.3 Development in the vicinity of rail
level noise criteria-
a) 65dB(a), assessed as the 24hour
average equivalent continuous Aweighted
sound pressure level; and
b) 87dB(A), assessed as a single event
maximum sound pressure level.
Compliance
014 Complies - The subject site is not in the vicinity of road or rail corridor.
14.150 Staged development
015Staged development is planned, designed No solution provided.
and constructed to ensure that-
a) each stage of the development can be
constructed without interruption to services
and utilities provided to the previous stages;
b) the infrastructure provided is capable of
servicing the entire development; and
c) the materials used are consistent throughout
the development.
Compliance
015 Not Applicable - The application is not staged.
BRSS6220.000 Report for Lodgement 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Application Forms REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 24.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.