Development Application part 2 Application Forms REC11/0145
Very large file (24.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
LANDPARTNERS
Water Supply & Sewerage Reticulation Code
column 1 column 2
Specific Outcomes Probable solutions (if code assessable}
14.164 Design and construction (water)
01 Water supply infrastructure- S1. 1 Water supply infrastructure is
a) meets the needs of the users; designed in accordance with PSP6 -
b) is designed to be compatible with existing Engineering Design Standards - Water and
infrastructure; and Sewerage and As Constructed data
c) is designed using materials that are suitable submitted in accordance with PSP6-
for the use, durable, easy to maintain and Engineering Design Standards - Water and
cost effective, taking into account the whole of Sewerage.
life cycle cost and Council's maintenance
inventory.
7 Compliance
S1.1 Complies - The water supply infrastructure will be constructed in accordance with PSP6
Engineering Design Standards - Water and Sewerage and As Constructed data will be submitted in
accordance with PSP6 - Engineering Design Standards - Water and Sewerage.
02 Water supply infrastructure is constructed- S2.1 Water supply infrastructure is
constructed in accordance with PSf1S -
standards; and Engineering Design Standards - Water and
b) to minimise adverse environmen/alimpacts. Sewerage,-
AND
52.2 Erosion and sediment control
measures are designed and implemented in
accordance with the Institution of Engineers
Australia (Queensland Division) Soil Erosion
and Sediment Control - Guidelines for
Queensland Construction Sites.
Compliance
S2.1 Complies - The water supply infrastructure will be constructed in accordance with PSP6
Engineering Design Standards - Water and Sewerage.
S2.2 Complies - Erosion and sediment control measures will be designed and implemented in
accordance with the Institution of Engineers Australia (Queensland Division) Soil Erosion and
Sediment Control - Guidelines for Queensland Construction Sites. Given the small scale of the
development this can be appropriately developed.
03 Water supply infrastructure is proven to be No solution provided.
suitable for its use prior to Council accepting the
dedicated asset.
Compliance
03 Complies - The water supply infrastructure will be in accordance with Council requirements.
04 Water supply infrastructure is provided with No solution provided.
all suoooiting technical documentation
Compliance
04 Complies - This can be appropriately conditioned.
05 Where buildings or other structures are in 55. 1 The footing of any building or structure
proximity to State or Council's water supply is located clear of the zone of influence but
infrastructure, provision is made to protect the no closer than 1.5m (measured horizontally)
infrastructure from physical damage and to allow from infrastructure including sewers, water
ongoing maintenance by Council mains and stormwater structures;
AND
55.2A registered easement in favour of
Council is created over all underground
infrastructure located in private property;
AND
BRSS6220.000 Report for Lodgement 60
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Application Forms REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 24.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.