Skip to the record
Accept no substitutions.

Council archive · source document

Development Application part 2 Application Forms REC11/0145

of 152

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (24.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

IANDPARTNERS


                                                     55.3 The width of the easement is the
                                                     greater of 3m or the width of the zone of
                                                     influence;
                                                     AND
                                                     55.4 The easement is centred over the
                                                     centreline of the infrastructure.
 Compliance
 05 Not Applicable - No building is proposed as part of the development.
 O6Alignment of water supply infrastructure        56.1 Infrastructure is designed and
 allows for easy access for the ongoing              constructed on the preferred alignments in
 maintenance by Council.                             accordance with PSP6 Engineering Design
                                                     Standards - Water and Sewerage.
 Compliance
 06.1 Complies - The provision of infrastructure will be designed and constructed on the preferred
 alignments in accordance with PSP6 Engineering Design Standards - Water and Sewerage.
 O7Any alterations or repairs to infrastructure as 57.1 Any alterations or repair to
 a result of the development are made at no cost   infrastructure as a result of the development
 to Council.                                       are completed at the developer's expense.
 Compliance
 S7.1 Complies - Any alterations or repair to infrastructure       a result of the development
 completed at the developers expense.
 Table 14-63 Sewerage reticulation
 14.165 Design and construction (sewer)

 a) meets the needs of the users;                    designed in accordance with PSP6
 b) is designed to be compatible with existing       Engineering Design Standards - Water and
 infrastructure; and                                 Sewerage.
 c) is designed using materials that are suitable
 of the use, durable, easy to maintain and cost
 effective, taking into account the whole of life
 cycle cost and Council's maintenance
 inventory.
 Compliance
 S8.1 Complies - Sewer reticulation infrastructure is designed in accordance with PSP6.
 09 Sewerage reticulation infrastructure is           S9.1 Sewerage reticulation infrastructure is
 constructed-                                         constructed in accordance with PSP6 -
 a) in accordance with appropriate engineering         Engineering Design Standards - Water and
 standards; and                                       Sewerage and As Constructed data
 b) to minimise adverse environmental impacts         submitted in accordance with PSP6 -
                                                      Engineering Design Standards - Water and
                                                      Sewerage;
                                                      AND
                                                      S9.2 Erosion and sediment control
                                                     measures are designed and implemented in
                                                     accordance with the Institution of Engineers
                                                     Australia (Queensland Division) Soil Erosion
                                                     and Sediment Control - Guidelines for
                                                     Queensland Construction Sites.
Compliance
S9.1 Complies - Sewerage reticulation infrastructure is constructed in accordance with PSP6 -
Engineering Design Standards - Water and Sewerage and As Constructed data submitted in
accordance with PSP6 - Engineering Design Standards - Water and Sewerage.
S9.2 Complies - Erosion and sediment control measures can be conditioned as part of the approval.
010 Sewerage reticulation infrastructure is        No solution provided.
proven to be suitable for its use prior to Council
accepting the dedicated asset.
Compliance
010 Complies - Sewer infrastructure will be constructed to Councils standards.
011 Sewerage reticulation infrastructure is         No solution provided.




                                       BRSS6220.000 Report for Lodgement                             61

Used in these records

About this file

File size
24.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 Application Forms REC11_0145.pdf · 24.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.