Development Application part 2 Application Forms REC11/0145
Very large file (24.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
IANDPARTNERS
55.3 The width of the easement is the
greater of 3m or the width of the zone of
influence;
AND
55.4 The easement is centred over the
centreline of the infrastructure.
Compliance
05 Not Applicable - No building is proposed as part of the development.
O6Alignment of water supply infrastructure 56.1 Infrastructure is designed and
allows for easy access for the ongoing constructed on the preferred alignments in
maintenance by Council. accordance with PSP6 Engineering Design
Standards - Water and Sewerage.
Compliance
06.1 Complies - The provision of infrastructure will be designed and constructed on the preferred
alignments in accordance with PSP6 Engineering Design Standards - Water and Sewerage.
O7Any alterations or repairs to infrastructure as 57.1 Any alterations or repair to
a result of the development are made at no cost infrastructure as a result of the development
to Council. are completed at the developer's expense.
Compliance
S7.1 Complies - Any alterations or repair to infrastructure a result of the development
completed at the developers expense.
Table 14-63 Sewerage reticulation
14.165 Design and construction (sewer)
a) meets the needs of the users; designed in accordance with PSP6
b) is designed to be compatible with existing Engineering Design Standards - Water and
infrastructure; and Sewerage.
c) is designed using materials that are suitable
of the use, durable, easy to maintain and cost
effective, taking into account the whole of life
cycle cost and Council's maintenance
inventory.
Compliance
S8.1 Complies - Sewer reticulation infrastructure is designed in accordance with PSP6.
09 Sewerage reticulation infrastructure is S9.1 Sewerage reticulation infrastructure is
constructed- constructed in accordance with PSP6 -
a) in accordance with appropriate engineering Engineering Design Standards - Water and
standards; and Sewerage and As Constructed data
b) to minimise adverse environmental impacts submitted in accordance with PSP6 -
Engineering Design Standards - Water and
Sewerage;
AND
S9.2 Erosion and sediment control
measures are designed and implemented in
accordance with the Institution of Engineers
Australia (Queensland Division) Soil Erosion
and Sediment Control - Guidelines for
Queensland Construction Sites.
Compliance
S9.1 Complies - Sewerage reticulation infrastructure is constructed in accordance with PSP6 -
Engineering Design Standards - Water and Sewerage and As Constructed data submitted in
accordance with PSP6 - Engineering Design Standards - Water and Sewerage.
S9.2 Complies - Erosion and sediment control measures can be conditioned as part of the approval.
010 Sewerage reticulation infrastructure is No solution provided.
proven to be suitable for its use prior to Council
accepting the dedicated asset.
Compliance
010 Complies - Sewer infrastructure will be constructed to Councils standards.
011 Sewerage reticulation infrastructure is No solution provided.
BRSS6220.000 Report for Lodgement 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Application Forms REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 24.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.