12936 Information Request - 125 Myall Street
Attached to the e-mail MCU14/0056 SARA Information request.
SDA-0714-012936
Item Information requested
Stormwater
e) Ensure the following are addressed, where applicable:
All relevant legal points of discharge for the development site are
identified. No new discharge points for stormwater will be permitted on
state controlled roads;
The impact of existing or proposed noise barriers on overland flow paths
is taken into account
Overland flow paths are identified and hydraulic conveyance is
maintained on the site as part of the proposed development
Flood storage capacity is maintained on the site as part of the proposed
development
The adverse impacts from sheet flow on the state controlled road
network are prevented
Existing stormwater drainage infrastructure on state controlled roads is
not interfered with or damaged such as through concentrated flows,
surcharging, scour, or deposition; and
The quality of stormwater discharging onto the state controlled road is
not reduced through erosion and sedimentation.
f) Include details of the mitigation measures proposed to address any potential
stormwater (including flooding impacts) of the proposed development.
Under section 278 of the Sustainable Planning Act 2009, when responding to this request you
must advise whether you are supplying all of the information requested, part of the information
requested, or none of the information requested. If you are supplying part or none of the
information requested, you are also required to provide written notice asking the department to
proceed with the assessment of the application.
The due date for receipt of this information is 6 months after the day you receive this request.
If necessary you may request an extension to this period. Unless a response to this request for
further information has been received from you within this period or any extension during this
period, your application will lapse.
A pro forma is attached to this notice to assist you in providing an information request
response which complies with the requirements of the Sustainable Planning Act 2009.
Please be advised that the application will be assessed on the basis of the information
provided. It is therefore recommended that you respond to all of the information requested by
the department. Further details regarding the information request response period and the
lapsing of development applications are set out in sections 279 and 280 of the Sustainable
Planning Act 2009.
Department of State Development, Infrastructure and Planning Page 3