Skip to the record
The only place to find full transcripts.

Council archive · source document

3365 261022 report · RAL19/0014.01

of 19

Text shows just the words. Original shows the document exactly as it was published.

2006 Council mapping shows a layer for Town Boundary, that appears to agree with
the UW participating Council’s PIA mapping. The subject property is clearly included
within the then Town Boundary. This would again align with the fact the sewer and
water connections are on site, with the sewer being connected in 2013 as part of infill
infrastructure provision.




Plate 5 –
Town boundaries - superseded Noosa Plan 2006 mapping (Noosa Interactive Maps)


Council’s current PIA does not include the subject property. Together with adjoining
properties to the south, it has been been excluded from the PIA land by Council.




Plate 6 – Priority Infrastructure Area & Service Catchment (Noosa Interactive Mapping)



The inconsistencies between Council’s scheme mapping now and the layers
mapped on Unity Water’s website make it difficult to forward plan and civil design.

Unity Water listing of the subject property as Restricted Connection Area caused a
six month delay in submission of the op works application.


                                             9

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

3365 261022 report.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.