The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.cam.au).
Approval of works shall not be granted until all “As Constructed” information has been supplied
and accepted by Council.
General Engineering
68. For the following classes of work associated with development, a Development Permit for
Operational Works must be obtained prior to commencement of works relating to that class of
work. The application may combine any or all of these classes of work: -
68.1. Site Civil Works
68.2. Roadworks
68.3. Stormwater Drainage
68.4. Frontage works
68.5. Site Filling
68.6, Excavation of materials to fill another site
68,7. Landscaping .
69. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works. In this regard a DXF/DWG file on
GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any
application for Operational Works.
70. Digital detaited design drawings and calculations shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and Stormwater drainage
works. To avoid conflict with underground pipes or services, all existing and proposed services
required by the development shall be shown on the plans.
71. To facilitate production of “As Constructed” drawings it is suggested that all design drawings
are submitted in the Asset Design and As Constructed (ADAC) digital format.
72. A programme of works shall be submitted with any application for any Development Permit for
Operational Works detailing the construction schedule and proposed environmental protection,
measures. . ‘
Where the program is changed for any reason whatsoever, a copy of the revised program shall
be submitted to Council's Works Inspector within seven (7) days.
73. Where Operational Works are likely to affect Nearby residents, at least 3 days notice of
commencement of work, the name of the site supervisor, and a 24 hour contact.telephone
number shall be distributed to affected residents.
74. The person acting on this permit shall apply and obtain for all other necessary permits including
crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any
other approvals required under any other Act.
75. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle. :
76. The following steps shalt be undertaken prior to commencement of any construction:
76.1. The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention .
to commence works.
76.2.. The Principal Contractor or any of his subcontractors shall not undertake any works
unless each contractor has public liability insurance in the sum of $10,000,000 and
copies of current public liability insurance policies are submitted to Council's inspector.
Page 9 of 11 Print Date: 29 October 2018, 3:45 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
court appeal.pdfRelated documentApplication case desk ↗
About this file
- File size
- 582 KB (small file)
- File type
No other editions are linked here.