Council archive · source document
court appeal · 152004.240041.3
Attached to the e-mail Change to Building Envelope - GIA - 152004.240041.3.
Noosa Council documents
Print Date: 29 October 2018, 3:45 PM
[OCR of page images]
Noosa Council documents
76.3. The Principal Contractor shall nominate a site representative and give a telephone
number that can reach the site representative at any time during a 24-hour day.
76.4. The site representative shall arrange to meet on-site with Council's Inspector to obtain
Council's requirements for construction of access.
76.5. All signage, including that for safety during construction, shall be in accordance with the
Manual of Uniform Traffic Control Devices and Department of Transport (Main Roads
Division) Roadworks Signing Guide.
ADVICE FOR INFORMATION PURPOSES ONLY AND ARE NOT CONDITIONS OF APPROVAL
1. Payment via credit card transaction will not be an acceptable method of payment for
development contributions conditioned in this permit.
2. The following property notation (or similar) shall be placed on Council's rates records for all
proposed lots to advise prospective purchasers that:
3. “On site domestic waste must be disposed of on site to a secondary treatment standard or
greater as defined by the latest version of the Department of Natural Resources & Mines - On-
site Sewerage Facilities Guidelines far Effluent Quality. In addition disposal areas shall be
located on slopes less than 20%, with cut-off drains provided around the effluent disposal areas
to prevent Stormwater runoff entering the disposal area, and constructed so as not to cause
surface erosign or tand instability."
Page 10 of 11 Print Date: 29 October 2018, 3:45 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
court appeal.pdfRelated documentApplication case desk ↗
About this file
- File size
- 582 KB (small file)
- File type
No other editions are linked here.