Original source · versioned page text
SBSMR 20004 Revision D - Response to RFI
5.1 PIPED DRAINAGE SYSTEM – PRE-DEVELOPMENT
Total Catchment is 3105m2
Coefficient of Runoff
The coefficient of runoff for the existing site has been determined using light cover bush with a
high soil permeability (sand) for zero fraction impervious, giving a C10 value of 0.53.
Time of Concentration
Slope of catchment: Length 55m, fall 4m.
Therefore Slope = 4/55 x 100 = 7.3%
For average grassed surface n = 0.045
Using Friend’s Equation:
t = 107nL0.333/S0. 2
= 107 x 0.045 x 55.333/7.30.2 = 12.3 minutes
However, adopt a time of 10 minutes.
EY % ARI 10 min Rainfall Intensity
1 1 102
0.2 5 155
0.11 10 181
0.05 20 205
0.02 50 236
0.01 100 259
Table 1 – 10min Rainfall Intensity
Using these values the pre-development flows are as follows
EY % ARI Pre Development Flows m3/s
1 1 0.037
0.2 5 0.067
0.11 10 0.083
0.05 20 0.098
0.02 50 0.124
0.01 100 0.142
Table 2 - Site Pre-Development
NMA-SBSWMR-20004 Noosa Youngcare 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.