Original source · versioned page text
SBSMR 20004 Revision D - Response to RFI
5.2 PIPED DRAINAGE SYSTEM – POST DEVELOPMENT
Post development areas adopted are as follows:
Total Catchment as before of 3105m2
It is proposed to use detention tank totaling 48m3 with a 160mm orifice overflow outlet for the
development. Additional detention will be provided by the construction of the bio-basin but
has not been included in the below calculations which will be conservative. The design of the
piped infrastructure and detention system was undertaken using Drains program has been used
with Extended Rational Method.
Drains Output:
EY ARI Post Development Flows m3/s
1 1 0.038
0.2 5 0.054
.11 10 0.061
.05 20 0.067
.02 50 0.075
.01 100 0.082
Table 3 - Site Post-Development
Comparing the results pre and post development:
AEP ARI Pre Development Flows m3/s Post Development Flows m3/s
0.632 1 0.037 0.038
0.181 5 0.067 0.054
0.095 10 0.083 0.061
0.049 20 0.098 0.067
0.02 50 0.124 0.075
0.01 100 0.142 0.082
Table 4 - Pre & Post Development Comparison
Flows discharging from the site will be adequately mitigated.
NMA-SBSWMR-20004 Noosa Youngcare 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.