SBSMR 20004 Revision D - Response to RFI

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

6.4 RESULTS
The outcome from the MUSIC modelling for the developed mitigated and developed
unmitigated scenarios are shown in the following tables.


                                Developed                 Developed              Load Reduction             Required Load
    Pollutant Type
                               Unmitigated                Mitigated                    (%)                  Reduction (%)
    TSS (kg/year)                  749                      59.6                      92.5                       80
     TP (kg/year)                 1.48                      0.225                     84.8                       60
     TN(kg/year)                  7.51                      3.15                       58                        45
   Gross Pollutants
                                     67.5                        0                        100                     90
      (kg/year)

              Table 5 - Pollutant Load Reduction Results –Bio Retention Saturated Hydraulic Conductivity of 200




                                Developed                 Developed              Load Reduction             Required Load
    Pollutant Type
                               Unmitigated                Mitigated                    (%)                  Reduction (%)
    TSS (kg/year)                  749                       88                       88.9                       80
     TP (kg/year)                 1.48                      0.324                     78.1                       60
     TN(kg/year)                  7.51                      3.95                      47.4                       45
   Gross Pollutants
                                     67.5                        0                        100                     90
      (kg/year)

              Table 6 - Pollutant Load Reduction Results –Bio Retention Saturated Hydraulic Conductivity of 50




The load reduction achieved meets the minimum load reductions from the Guidelines. Given
the proposed development will meet the water quality and quantity objectives it is considered
that the development complies with Noosa Council’s stormwater requirements.




NMA-SBSWMR-20004 Noosa Youngcare                                                                                        12
Log in to download the original file

SBSMR 20004 Revision D - Response to RFI.pdf · 3.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.