Council archive · source document
Appendix D - 52 Hastings Street, Noosa Heads - Change Application 17.1.19 · 51994.1435.01
Attached to the e-mail Change to DA (Include Outdoor Dining Area & Awning Structure) 51994.1435.01.
~Door side panels -Glazing that can be mistaken for a doorway, this must also be marked (motifs). Steps greater than 3 risers require a landing before a doorway Waterproofing WC's and laundries require the wall/floor joint waterproofed for 25mm up the wall and onto the concrete floor. Lift off hinges may be needed on some toilet and bathroom doors (Clause 3.8.3.3) Brick Ties to be stainless steel or polymer <ikm from surf & <100m from canals etc. 1-10km from surf & 100m-1km from canals etc ties to be galvanised after manufacture (470g/m?). Other areas can be galvanised sheet steel. Internal bathrooms and toilets to be provided with an adequate system of mechanical ventilation. Smoke Alarms We recommend that smoke alarms be interconnected. It increases their effectiveness as an early warning (or lifesaving) device. Pool Fencing - It is worth remembering that the liability for maintaining the safety of a pool rests with the property owner. Direct access from the house to the pool enclosure is not allowed. Fireplaces require a 400mm Hearth for Free standing & 300mm for open & Insert type, this is required to extend 150mm either side and be 150mm above and combustible material (flooring etc), refer 3.7.3 BCA for further info. Applicant to ensure sufficient clearance between treatment plant/septic dispersal areas and new works. Retaining walls and fences - Retaining walls over 1 metre high need building approval and an engineer's certificate for the design. Fences can be up to 2 metres in height above natural ground level without needing approval. The combined height of a retaining wall and fence is not to exceed 2 metres above natural ground surface without approval by the Local Authority. Finished slab heights must be 150mm above finished ground level, or 50mm above sealed area, falls away from the building must be 50mm in 1m (this includes areas beneath landscaping stones). Ply Bracing at 6.0KN/m requires 13kN hold [email protected] centres, batten screw or strap provide only 4kN and are not acceptable, minimum 10mm bolted connection required. Termite protection required for all new works in ground contact to AS3660.1, any disturbed ground next to existing works to be re-treated to AS 3660.2, Basement or below ground Excavation may require special earth retention (sheet piling etc), before works are undertaken builder to consult with the foundation engineer to advise on requirements. Covenant approval is mot part of our assessment and the owner/applicant is responsible for obtaining and being consistent with this consent, refer to contract of purchase for details. Sediment And Erosion Control Measures should be put in place before any site works occur. Runoff from building sites, which carries sand, sift, and clay, is a major contributor to the degradation of the creeks and waterways. Failure to contro! such runoff is an offence under the Environment Protection Act (EPA) for which on-the-spot fines apply. Contaminated runoff is also responsible for clogging stormwater drains, thereby reducing their effectiveness and causing localised flooding. « Acid Sulphate Soils. Acid Sulphate Soils occur predominantly on coastal lowlands with elevations, or excavations below 5.0 m AHD. Please be advised that the onus is on the owner to seek a determination on whether or not the proposal will have any impact on acid sulphate soils. Under the Environment Protection Act 1994 (EPA), all responsible and practicable measures should be taken to avoid the risk of environmental harm. Noise restrictions: No audible noise permitted: * 6.30pm to 6.30am — Monday to Saturday. « Sundays and public holidays. Vehicle Crossovers, Prior to placing concrete an inspection to be booked with Gold Coast City Council by phoning 55828184 and quoting the preliminary permit number Existing. Reactive Clay sites, Refer to attached detail for recommended guidelines for Sanitary and storm water installations on reactive clay sites, These can also be accessed at www.bsa.ald.gov.au under builder’s technical information, BA21406
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - 52 Hastings Street, Noosa Heads - Change Application 17.1.19.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.