Decision Notice OPW23 0179 · OPW23/0179
LP308 B Planting Plan – Shrubs – Ground Back 19/02/24
LP309 B Planting Plan – Shrubs – First Floor 19/02/24
LP310 B Planting Plan – Ground Covers – Ground Front 19/02/24
LP311 B Planting Plan – Ground Covers – Ground Back 19/02/24
LP312 B Planting Plan – Ground Covers – First Floor 19/02/24
LP401 B Landscape Details 19/02/24
LP402 B Landscape Details 19/02/24
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 4 April 2026, unless an application to extend the currency period is
approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
3. Prior to the Prestart Meeting, submit and have approved by Council an amended Dewatering
and Acid Sulfate Management Plan. The document is to be prepared and certified by a
suitably qualified Registered Professional Engineer Queensland (RPEQ) and demonstrate
how Acid Sulfate affected water encountered during excavation will be treated and disposed
of. The following specific amendments are to be included:
a. The DMP states that the shoring design is provided in Appendix C – however only the
civil engineering plans are provided. Include plans which show the location and type of
temporary shoring, groundwater spears, treatment and monitoring equipment location
and space requirements. Why do the structural engineering plans (provided
separately) only show shoring on 3 sides of the excavation? The type of CFA piling
(contiguous or secant) should also be stated on plan.
b. Remove references to ‘steel sheet piling’ on page 10 and refer to CFA secant piling.
Please note that the references should reflect the proposed method or the alternate
method chosen by the civil engineer.
c. Update section 6.5.2 and 6.5.3 (Water Quality Monitoring) to include continuous
monitoring of pH and dissolved oxygen at the release point from the treatment system.
Total iron and aluminium are to be sampled where identified in the document as ‘if
required’.
d. Update the figure in Appendix A to also show the stormwater network and specifically
the stormwater pit which the dewatering system will discharge into and the outlet
headwall.
e. Update section 6.4.3 to identify that discharge is to the stormwater network prior to
entering the canal system.
f. There seems to be plenty of room in the frontage of the site for establishing a
groundwater monitoring bore outside of the excavation and shoring system in which to
monitoring groundwater drawdown and quality. Update the monitoring section of the
DMP to incorporate such a monitoring location.
g. Section 7 (Noise) is to be updated to refer to the default noise standard for pumps in
Section 440T of the EPA Act. The EEP (Noise) objectives currently referenced are
long-term objectives rather than a specific enforceable standard.
Page 3 of 14
Document Set ID: 22929254
Version: 3, Version Date: 05/04/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW23 0179.pdfRelated documentApplication case desk ↗
About this file
- File size
- 194 KB (small file)
- File type
No other editions are linked here.