Original source · versioned page text
RFI - Attachment D - Assessment of Environmental values - Callaghan and Toth
Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay
Column 1 Column 2 Column 3
Specific Outcomes Probable solutions (if Response
applicable)
13.9 Vegetation retention and conservation
Environmental Protection Area &
Environmental Enhancement Area The proposed carpark area on Lot 7 SP173771 is no
vegetation & Riparian Buffer Area S1.1 An Ecological Assessment Report prepared in longer proposed. See updated plans showing the carpark
accordance with Planning Scheme Policy 18 – areas to be located within Lot 5. The existing grassed
O1 Vegetation of local origin on premises Ecological Assessment Guidelines demonstrates that area to the north of the lower mill buildings will provide 47
identified as – the flora on the premises does not constitute new carparks. The works are still partly within Council
a) Environmental Protection Area or Environmental Protection Area or Environmental mapped Riparian Buffer Area but does not require
Riparian Buffer Area on the Enhancement Area vegetation. clearing of existing native vegetation.
Biodiversity Overlay maps OM1.1 to
OM9.1, is retained and conserved in OR The associated access driveways and proposed
its present form or improved to hardstand areas also do not require clearing as the works
ensure its ongoing contribution to the S1.2 Where constructing a Detached House; or are located within existing clear areas.
natural resources and biological Community residence interference with vegetation
diversity of the Noosa Shire; and does not extend beyond – The refurbishment works proposed on Biobasin 1 (BB1)
b) Environmental Enhancement Area a) 30m of a building or 10m of a structure on lots and Biobasin 2 (BB2) are both within Riparian buffer
on Biodiversity Overlay Maps greater than 10ha; or areas. Plan 2001-03 Revision A shows how an excavator
OM1.1-OM9.1, is protected from the b) 10m of a building or structure on lots 10ha or and truck can be located on the edge of the existing
impacts of development by- less but more than 0.3ha; or biobasins to undertake the works (i.e. removal of filter
i. avoiding edge effects; c) 3m of a building or structure on lots 0.3ha or material, pipes etc and replacement of pipes, filter media
ii. avoiding fragmentation; and less. and outlet pit) without clearing any vegetation adjacent to
iii. maintaining vegetation in the biobasins.
manageable and viable S2.1 Where clearing vegetation on the premises is
configurations. for the purposed of Reconfiguring a Lot -
a) new boundaries to lots do not transect and
AND fragment existing vegetation;
b) new lots are created to allow for suitable house
O2 For the purpose of Reconfiguring a Lot site areas or other future buildings and works to
new lots are only created where they be located within existing cleared areas or areas
minimise the fragmentation and maximise of low ecological value; and
the retention of the existing vegetation. c) building envelopes are designated for each lot.
O3 Clearing vegetation only occurs where S3.1 No solution provided No vegetation clearing is proposed.
–
a) no other suitable cleared or partially
cleared area is available on the
premises;
X:\JOBS\CT Projects in progress\2001 env reports for cooroy playground carparks\Correspondence\Reports\ENV\Lower Mill Carpark\revision 1\Biodiversity Overlay_LowerMillCarparkExtension_July2020.docx pg. 7
pg. 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.