RFI - Attachment D - Assessment of Environmental values - Callaghan and Toth
Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay
b) the development minimises the total
footprint within which all activities,
buildings, structures, driveways and
other works are contained; and
c) the development is located in areas of
low ecological value over other areas,
to the greatest extent practicable.
O4 Wetlands are protected from removal S4.1 A minimum separation distance of 100m is The works are within 20m of Cooroy Creek which is east
or degradation and any adverse impacts provided between a wetland and any adjacent of the proposed new swale (Swale 2) on Lot 7 SP173771.
on wetlands are prevented, minimised or development or use.
mitigated by- The new carpark is no longer porposed in Lot 7 but will be
a) maintaining adequate separation located within Lot 5 on the existing grassed area.
between the wetland and any adjacent
development or use; There will be no changes to flows for Cooroy Creek as
b) minimising any modification of the shown in the Flood Study by Hydrology and Water.
natural characteristics of the wetland,
including the topography, surface and There will be no access into the retained vegetation
groundwater hydrology, water quality following completion of works or changes to the surface
and flora and fauna species; levels in the retained vegetation areas.
c) preventing any new development
within wetlands; As a result of the proposed new hardstand areas, the
d) minimising access to the wetland; existing biobasins are to be refurbished with new filter
e) minimising impacts associated with media and outlet pit to ensure they are to current best
pest insect control and invasion by practice design standards and removing nutrients and
undesirable plant species; and pollutant loads prior to stormwater entering Cooroy Creek.
f) providing for the rehabilitation and
replanting of degraded wetlands. The existing biobasins have been in place for a minimum
of 14 years and are not to the current best practice design
standards. As such by improving the design and
functionality of the biobasins, this will improve the water
quality of stormwater runoff into Cooroy Creek, with the
overall health of this waterway being improved.
Riparian Zones The site falls within the Riparian Buffer Areas on the
O5 The biodiversity and ecosystem S5.1 No new development occurs on, or partly on, Biodiversity Overlay.
values of watercourses, drainage lines, premises indicated as Riparian Buffer Area on
wetlands and adjacent riparian zones are Biodiversity Overlay Maps OM1.1 to OM9.1, except The proposed works will not require clearing as the new
protected by – for- carpark and access road are located within existing clear
a) avoiding any new development in the a) temporary use of the land; or areas.
riparian buffer area; b) infrastructure which provides access to a
b) retaining aquatic and terrestrial habitat watercourse for recreational purposes; The Cooroy Creek riparian vegetation has been subject to
in riparian zones; a long-term revegetation program by Noosa District
X:\JOBS\CT Projects in progress\2001 env reports for cooroy playground carparks\Correspondence\Reports\ENV\Lower Mill Carpark\revision 1\Biodiversity Overlay_LowerMillCarparkExtension_July2020.docx pg. 8
pg. 8