Council archive · source document
Response to information request (rec. 4.9.25) MCU25-0060 · MCU25/0060
8. Provide written authority from the Body Corporate for any changes to the
common property infrastructure.
There is no requirement for the Body Corporate involvement in the Material Change of
Use application. Preliminary discussions have been undertaken with the Body Corporate
and the proposed driveway is located to ensure no net loss in parking spaces within the
private road. The site plans demonstrate the relocation of street parking, including two
bays in front of the property.
----------------------------------------------------------------------------------------------------------------------
Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested. Please proceed with the processing of the application
at your earliest convenience.
If you have any further queries in relation to the above, please do not hesitate to contact
myself.
Regards,
Jack Lewis B.Sc Hons UNSW M.Plan Otago RPIA
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227
Page 5 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to information request (rec. 4.9.25) MCU25-0060.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.