Council archive · source document
20327 - Amended Concurrence agency response With conditions · OPW15/0061
Attached to the e-mail OPW15/0061 - email from consultant with amended concurrence response.
SDA-0415-020327 Our reference: SDA-0415-020327 Your reference: OPW15/0061 Attachment 1—Amended Conditions to be imposed No. Conditions Condition timing Operational Work 7.2.13 Tidal works, or development in a coastal management district —Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of Department of Environment and Heritage Protection to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 1. The development should be carried out generally in accordance At all times with the following plans: 1. Scheme of Works, prepared by International Coastal Management, dated 06.02.2015, Drawing Number MPG- 001; 2. Groynes – Plan Layout, prepared by International Coastal Management, dated 06.02.2015, Drawing Number MPG- 002; 3. Groyne 1 Sections, prepared by International Coastal Management, dated 06.02.2015, Drawing Number MPG- 003; 4. Groyne 2 Sections, prepared by International Coastal Management, dated 06.02.2015, Drawing Number MPG- 004; 5. Groyne 3 Sections, prepared by International Coastal Management, dated 06.02.2015, Drawing Number MPG- 005; 6. Monitoring Program, prepared by International Coastal Management, dated 15.05.2015, Drawing Number MPG- 006. 2. During the construction phase of the works: For the duration of (a) install and maintain all measures, plant and equipment the works the subject necessary to ensure compliance with these conditions; of this approval (b) only use materials which are: i. clean and free of silt; ii. free from pests, chemicals and other contaminants as defined under section 11 of the Environmental Protection Act 1994; and iii. suitable for the purpose; and (c) promptly remove any material or debris which has been deposited within the coastal management district or tidal waters, other than in accordance with this approval. 3. Erosion and sediment control measures are to be installed and Prior to maintained to prevent the release of sediment into tidal waters. commencement of the work and maintained until their completion 4. Any disturbed or oxidised acid sulphate soil must be treated and For the duration of managed in accordance with the current Queensland Acid Sulfate the works the subject Soil Technical Manual: Soil Management Guidelines v4.0, of this approval. prepared by the Department of Science, Information Technology, Department of State Development, Infrastructure and Planning Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20327 - Amended Concurrence agency response With conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.