Council archive · source document
20327 - Amended Concurrence agency response With conditions · OPW15/0061
Attached to the e-mail OPW15/0061 - email from consultant with amended concurrence response.
SDA-0415-020327
No. Conditions Condition timing
Innovation and the Arts.
5. RPEQ certification confirming the development has been Within two (2) weeks
constructed in accordance with the Department of Environment of the completion of
and Heritage Protection guideline ‘Building and Engineering the works
standards for tidal works’ or relevant Australian standards.
A copy of the certification must be provided to:
Department of Environment and Heritage Protection
Permit and License Management,
Implementation and Support Unit
GPO Box 2454
Brisbane QLD 4001
6. The permit holder shall, at its own cost and expense, employ a As prescribed in the
surveyor to carry out a beach profile monitoring program of the condition
development area prior to the construction of the proposed
groynes, and at 3, 6 and 12 months after completion of the
1
groynes and after major flood events . The monitoring program
shall:
(a) Consist of a shore normal beach profile survey
undertaken in accordance with the plan titled Monitoring
Program, drawing number MPG-006, prepared by
International Coastal Management, dated 15 May 2015.
A copy of the survey results of the beach profile monitoring
program must be submitted to the Department of Environment and
Heritage Protection upon request.
A report addressing the results of the beach profile monitoring
program shall be submitted to the Department of Environment
and Heritage Protection within three (3) months after completion
of the twelve (12) month survey.
1
– A major flood event is defined by the Bureau of Meteorology’s
Flood Warning System for The Noosa River, available through
the following link:
http://www.bom.gov.au/qld/flood/brochures/noosa/noosa.shtml
Operational Work
7.2.15 Tidal works, or development in a coastal management district—Pursuant to section 255D of
the Sustainable Planning Act 2009, the chief executive administering the Act nominates the
Director-General of Department of Transport and Main Roads to be the assessing authority for the
development to which this development approval relates for the administration and enforcement of
any matter relating to the following condition(s):
7. Provide written notice to Regional Harbour Master (Brisbane) – (a) At least two
Address below, when the development authorised under this weeks prior to the
approval has: commencement of
(a) commenced; and the works
(b) when it has been completed.
(b) Within two weeks
These notices must state this permit number, the location and after the completion
name of registered place and the condition number under which of works
the notice is being given.
Department of State Development, Infrastructure and Planning Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20327 - Amended Concurrence agency response With conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.