Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

20327 - Amended Concurrence agency response With conditions · OPW15/0061

Attached to the e-mail OPW15/0061 - email from consultant with amended concurrence response.

of 14

Text shows just the words. Original shows the document exactly as it was published.

                                                                                           SDA-0415-020327




No.         Conditions                                                            Condition timing
            Regional Harbour Master (Brisbane)
            Maritime Operations Base
            MacArthur Avenue East
            Pinkenba QLD 4008
8.          "As Constructed" drawings must be provided to                         Within two weeks of
                                                                                  the completion of the
            Regional Harbour Master (Brisbane)                                    works
            Maritime Operations Base
            MacArthur Avenue East
            Pinkenba QLD 4008
9.          The construction, operation or maintenance of the structure, and      At all times
            any ship moored at this structure, must not impede the safe
            navigation of other ships or restrict safe access to or from
            neighbouring structures.
10.         Any navigational aid that is damaged due to the construction,         At all times
            operation or maintenance of the approved development must be
            promptly repaired or replaced at the applicant’s cost. In the event
            that any damage is caused to any aid to navigation, the Harbour
            Master must be immediately contacted on 07 3305 1700.
11.         All structures, associated with the development must be lit/marked    At all times
            in accordance with the following specifications, such that they are
            clearly visible to approaching ships and do not cause a risk to the
            safe navigation of other ships:
             Underwater obstruction signs adjacent to the area for visibility
                 by mariners.

            Any anchors deployed to be marked with yellow buoys and fitted
            with FL yellow lights to ensure safe navigation of other ships.

            All lighting must be provided in accordance with section 3 of AS
            4282-1997 'Control of the obtrusive effects of outdoor lighting'
            All floating plant and equipment shall be appropriately lit and/or
            marked. Floating plant and equipment is to be lit in accordance
            with the International Regulations for the Prevention of Collision
            at Sea.
12.         Any debris or similar obstruction encountered whilst undertaking      Prior to the
            the work must be suitably disposed of at the applicant's cost.        completion of works




Department of State Development, Infrastructure and Planning                                 Page 5

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20327 - Amended Concurrence agency response With conditions.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.