Attachment C - Copy of 2019 Approval - Decision Notice · MCU19/0049.01
Retaining walls and Fall Protection
27. To preserve amenity and the heritage character to Maple Street, the retaining wall associated
with the proposed south parking area and its access ramp, shown on Elevation Plan (East)
DA030 Rev E, dated 19/09/2019 (as annotated by Council), should only be as high as it
needs to be for structural and/or earthworks retaining purposes and not be extended above
the finish ground level. Any required fall protection and/or fences above the retaining
structure is to be a picket or wooden rails fence style and its details must be included in the
application for Operational works for landscaping.
Frontage Works – Hospital Lane
28. Hospital Lane must be provided with two passing bays. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. Road widening to provide vehicle passing bays minimum length of 12.0m and an
overall minimum width of 6.0m;
b. The passing bays must include a minimum 10.0m long tapers at both ends of the
passing bays to provide transition between the new 6.0m wide bitumen seal and
existing width of lane’s bitumen, about 3.0m;
c. The new road widening works must include kerb and channel consistent and tying with
the existing;
d. The road widening works should have a minimum clearance of 600mm from the face
of kerb line to the new property boundary line;
e. Suitable linemarking and signage to prohibit parking along the passing bays;
f. Passing lanes may be located near or to include the proposed driveway crossovers to
the property.
Condition 28 is imposed pursuant to s665 of the Planning Act 2016 being non-trunk
infrastructure.
29. Any existing redundant driveway must be removed and the grassed verge be reinstated or
landscaped to match proposed finish surfaces.
30. Any damaged kerb and channel along the frontage of the property must be replaced to the
reasonable satisfaction of Council.
Frontage Works – Maple Street
31. The frontage to Maple Street is to be upgraded for the length of its frontage to the subject
site to Maple Street. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. Upgrading of the existing concrete pedestrian pathway to a 2.0m wide new concrete
pathway in accordance with standard drawing RS-065 and must be tapered and
extended beyond the frontage of the site to match the width and levels of adjoining
existing sections of pathway;
b. Any required pedestrian access to the site;
c. Any reinstatement of verge area to match the new pathway, including the provision of
topsoil and turf where the existing verge is grassed;
d. Landscaping as required by the landscape conditions of this permit.
g. Condition 31 is imposed pursuant to s646 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
Pedestrian and Bicycle Facilities
32. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. Internal pedestrian footpaths in accordance with the approved plans
Page 5 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment C - Copy of 2019 Approval - Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 451 KB (small file)
- File type
No other editions are linked here.