41. Directional signage must be provided to direct visitors to the car parking spaces provided on
site.
42. All linemarking and traffic signage associated with the new works must be provided in
accordance with the Manual of Uniform Traffic Control Devices (MUTCD) and AS 1906.1,
and in compliance with an Operational Works approval.
Earthworks
43. All earthworks and earth retaining works must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
Waste Management
44. A detailed operational waste management plan must be submitted with the operational works
the application of the civil works for Council’s assessment and approval, including but not
limited to the following details:
a. Waste storage details, locations and associated signage.
b. Waste collection details, procedures and times tables of collection.
c. Waste collection vehicles routes and manoeuvring within the site, entry and exit from
the site, and taking into consideration the final engineering design for the northern
access to Hospital Lane.
Service vehicles
45. Service/delivery vehicle movements associated with the approved use (including loading and
unloading) must not occur outside the hours of 6.30am to 6pm Monday to Saturday and not
at all on Sundays or public holidays. The requirements of this condition must be included in
the Community Management Statement for any body corporate for the subject site.
Amenity
46. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any
other emissions in accordance with the nuisance provisions of the Environmental Protection
Act 1994.
47. All mechanical equipment on site must be in accordance with the Environmental Noise
Assessment, prepared by Acoustics RB Pty Ltd dated October 2018.
Noise Nuisance
48. Noise emission from mechanical equipment must comply with the following requirements:
a. Air-conditioning, refrigeration, fans including mechanical exhaust fans/ventilation, plant
rooms and refuse compactors:
• 7am to 10pm: Maximum background + 5dB(A)
• 10pm to 7am: Maximum background + 3dB(A)
49. Submission of written certification from a suitably qualified person confirming that the noise
levels from all mechanical equipment comply with the noise requirements of this Decision
Notice when measured at either the residential boundary or outside the most exposed part
of an affected building, whichever is the closest to the equipment.
Easements
50. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
Page 7 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment C - Copy of 2019 Approval - Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 451 KB (small file)
- File type
No other editions are linked here.