Council archive · source document
Attachment C - Copy of 2019 Approval - Decision Notice · MCU19/0049.01
Works
62. Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste management
63. A Waste Management Plan (demolition) must be submitted in accordance with Planning
Scheme Policy 11 - Waste Management Plan and approved by Council’s Waste Coordinator
prior to the commencement of demolition works.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Segregated wastes attract significantly
reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
mixed waste.
Waste storage areas must provide for adequate separation of all reusable, recyclable and
waste materials. These must be located so that they are convenient and safe to use.
The Plan must contain the following information:
a. Traffic Management Plan prepared by suitably qualified person for the demolition works
period. All required traffic control signage must be in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD);
b. All required erosion and sediment control measures to be employed or undertaken
during the demolition works to ensure sediment and other material from the demolition
does not leave the site;
c. The erosion and sediment control measures must be designed, installed and maintained
in accordance with current best practice standards until all disturbed surfaces are
stabilised;
d. The areas for the storage and separation of waste shown on a site plan;
e. A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed;
Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify contractor
materials volume(m³) *specify proposed *specify contractor and landfill site or
re-use or on-site and recycling outlet other disposal site
recycling methods
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is
to be completed by the demolition contractor.
Page 9 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment C - Copy of 2019 Approval - Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 451 KB (small file)
- File type
No other editions are linked here.