Council archive · source document
0015D9DE.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
NOOSA COUNCIL IDAS Development Application Decision Notice 5
21. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
on construction works during the maintenance period, which is a minimum period of 12 months duration.
Such bond must be lodged by, and shall only be accepted from the Developer for the works.
22. Deleted.
23. Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two (2) years
from the day this permit takes effect during which time all conditions must have been complied with and
the Plan of Survey lodged with the Council for endorsement.
24. Notwithstanding that Council has checked the plans with due care, where it is found during construction
that variations from Council's standards exist, then Council standards shall apply
NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@80007420\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015D9DE.001.pdfRelated documentPublic source context ↗
COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 38 KB (small file)
- File type
No other editions are linked here.