NOOSA COUNCIL IDAS Development Application Decision Notice                                                            4

      If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
      Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
      engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager-Land
      Development and shall forthwith rectify the damage to that property or facility at its cost and to the
      satisfaction of the Manager-Land Development, prior to the sealing of the easement plan or, alternatively,
      the Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
      being paid by the Applicant to the Council prior to the sealing of the easement plan, provided that in the
      case of emergency the Council shall be entitled to rectify such damage at the cost of the Applicant, such
      cost being paid prior to the sealing of the easement plan`.

      A management strategy to ensure no damage occurs to Council services shall be given to Council for
      assessment prior to the pre start meeting.

14.   The development of the site shall be carried out in such a manner as to prevent dust and/or sand nuisance
      to residents and/or tenants in the vicinity of the development.

15.   Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
      pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
      hours are approved by the Manager-Land Development or his nominee.

16.   All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
      Traffic Control Devices and Traffic Infrastructure (Roads) Act.

17.   Safe pedestrian access on Elizabeth Street shall be maintained at all times. Should footpath / road
      closures be necessary to carry out construction works, Council’s Construction Technical Officer (ph 0410
      512 505) must be notified prior to the proposed closure.

18.   Sediment and erosion control measures must be in place prior to works commencing. If such measures
      are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
      sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
      natural waterways. Although the sediment and erosion control measures have been approved on drawing
      No<, Council’s Manager – Land Development may request further controls to be installed should approved
      measures be inefficient.

19.   All stormwater drainage lines including private drainage lines (also known as inter-allotment drainage
      lines) or as otherwise approved by Council’s Manager of Land Development shall be inspected by closed
      circuit television (CCTV) at the completion of all works and immediately prior to acceptance ‘On
      Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of this inspection.
      A report of the CCTV inspection, including photographic records (which includes photos & video
      recordings burnt onto a CD) of the inspection shall be submitted to the Council for approval. Any defects
      or substandard works shall be recorded and accurately illustrated on the drainage plan showing the
      location of the defect(s).
      Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the applicants expense
      with a further CCTV inspection arranged once the rectification works have been completed.
      To this extent all CCTV inspections, including any additional inspections necessary following defect
      identification and rectification, shall be entirely at the applicant’s expense. Any costs incurred by Council
      in reviewing the CCTV inspection results shall also be borne by the applicant.

20.   Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement of
      satisfactory “As Constructed” records shall be submitted to Council.

      As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for
      design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all
      services and structures. All of which shall be submitted to Council for checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage structures,
      finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
      As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
      www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
      Drainage and Earthworks.
      Approval of works shall not be granted until all As Constructed information has been supplied and
      accepted by Council.




NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@80007420\@[email protected]

Used in these records

About this file

File size
38 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015D9DE.001.pdf · 38 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.