NOOSA COUNCIL IDAS Development Application Decision Notice 4
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager-Land
Development and shall forthwith rectify the damage to that property or facility at its cost and to the
satisfaction of the Manager-Land Development, prior to the sealing of the easement plan or, alternatively,
the Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
being paid by the Applicant to the Council prior to the sealing of the easement plan, provided that in the
case of emergency the Council shall be entitled to rectify such damage at the cost of the Applicant, such
cost being paid prior to the sealing of the easement plan`.
A management strategy to ensure no damage occurs to Council services shall be given to Council for
assessment prior to the pre start meeting.
14. The development of the site shall be carried out in such a manner as to prevent dust and/or sand nuisance
to residents and/or tenants in the vicinity of the development.
15. Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Manager-Land Development or his nominee.
16. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
Traffic Control Devices and Traffic Infrastructure (Roads) Act.
17. Safe pedestrian access on Elizabeth Street shall be maintained at all times. Should footpath / road
closures be necessary to carry out construction works, Council’s Construction Technical Officer (ph 0410
512 505) must be notified prior to the proposed closure.
18. Sediment and erosion control measures must be in place prior to works commencing. If such measures
are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
natural waterways. Although the sediment and erosion control measures have been approved on drawing
No<, Council’s Manager – Land Development may request further controls to be installed should approved
measures be inefficient.
19. All stormwater drainage lines including private drainage lines (also known as inter-allotment drainage
lines) or as otherwise approved by Council’s Manager of Land Development shall be inspected by closed
circuit television (CCTV) at the completion of all works and immediately prior to acceptance ‘On
Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of this inspection.
A report of the CCTV inspection, including photographic records (which includes photos & video
recordings burnt onto a CD) of the inspection shall be submitted to the Council for approval. Any defects
or substandard works shall be recorded and accurately illustrated on the drainage plan showing the
location of the defect(s).
Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the applicants expense
with a further CCTV inspection arranged once the rectification works have been completed.
To this extent all CCTV inspections, including any additional inspections necessary following defect
identification and rectification, shall be entirely at the applicant’s expense. Any costs incurred by Council
in reviewing the CCTV inspection results shall also be borne by the applicant.
20. Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement of
satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for
design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all
services and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
Drainage and Earthworks.
Approval of works shall not be granted until all As Constructed information has been supplied and
accepted by Council.
NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@80007420\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015D9DE.001.pdfRelated documentPublic source context ↗
COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 38 KB (small file)
- File type
No other editions are linked here.