07/2291 - MCU Detached House [As Published] · 132007.2291
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)
mark . . (J (i): tidal work*3 as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For more + . A
information about prescribed lidat work in local Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
Government Sal areas refer to Guile 24 (ii) tidal work that is prescribed tidal work"* - complete Part P of Form 1; 0
Unless you answered ‘none of the above" to Q10, - . wae oo.
the application triggers referrat to Queenstand C1 (iii) carried out within a coastal management district's under the Coastal Act and for -
Transport {QT} (Maritime Safety Otd) as a . . 7 . ope ge
concurrence agency. LC (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager for all M of Form 1;
prescribed tidal work. aa .
wo (b) reclaiming land under tidal water - complete Part M of Form 1; or
(J (c)_ constructing a canal’s, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
din none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
he more information refer to Guide 16. (i) amaterial change of use assessable under a planning scheme involving operational
inless you answered ‘none of the above” to Q11, “ + 5 ctrit5
the application requires assessment by the work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). C1 (i) a material change of use assessable under a planning scheme involving building
Hf an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
manager for the application, EPA is a concurrence : .
agency for the application in relation to this matter. « the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m2
C1 (il) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
Oi (iv) reconfiguring a Jot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal'® - complete Part M of Form 1
aw none of the above
Development within the limits of a 12. Does the application involve development below high water mark’? and within the limits of a port
port unger the Transport Infrastructure Act 1994?
For more information refer to Guide 18. For NO
information about prescribed tidal work refer to
Guide 24. (11 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
tf you answered “YES” to Q12, the application
triggers referral to the Port Authority,
The Port Authority is a concurrence agency if the
development is ~
© within 200m of a shipping channel or an entry
and exit shipping corridor for the port
© within 1000m of a swing basin, a commercial
shipping wharf, a mooring, ancharage or spoil
grounds;
© within 1000m of a planned port facility identified
in aland use plan approved under the Transport
Infrastructure Act 1994.
4n all other situation the Port Authotity is an advice
agency.
Marinas 13. Does the application involve operational work that is tidal work for a marina” with more than 6
For more information refer to Guide 18. For vesgel berths?
information about whether a marina is prescribed AN
tidal work refer to Guide 24. The tocal govemment NO
i for all prescribed tidal
ise assessment manager for al prescribed hi LL YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work
Ifyou answered "YES" to 013, the application
triggers referral to Queenstand Fire and Rescue
Service as an advice agency.
Tidal works in strategic port land tidal] 14. Dogs the application involve tidal works within a strategic port land tidal area?"?
areas
For more information refer to Guide 18.
Unless you answered “NO” to 014, the relevant Port
Authority is the assessment manager for the
application and the Environmental Protection
Agency {EPA} and Queensland Transport (Q7) are
concurrence agencies for the application.
NO
(21 YES - complete Part M of Form 1
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastat Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 Canal means canal as defined under the Coastal Protection and Management Act 1995
17 GFA is defined in sch 14 of the IPA to mean the gross fioor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
18 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificiat waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
49 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2291 - MCU Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.