Council archive · source document
07/2291 - MCU Detached House [As Published] · 132007.2291
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005 Heritage 15. Does the application involve development in a heritage registered place as defined under the For further information refer to Guide 19, Queénsiand Hentage Act 1992? Kyou answered “YES to Qi5, the application NO biggers refercal to the Queensland Heritage Council as concurrence agency for the application. Oo YES - complete Part C of Form 1 Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and For more information, including a list of the dectared involves: (tick the applicable box/es) catchment areas within Queensland, refer to Guide . . . . . 13, _ (4) reconfiguring a ot, if any lot resulting from the reconfiguration is less than 16 hectares; mess you answered “none of the above’ to a6, Li (ii) development assessable against the planning scheme involving the establishment or Ceol Neha Rosaaces oe Mines expansion of a waste water disposal system, other than a disposal system for carrying (NREM), out an environmentally relevant activity under the Environmental Protection Act 1994; If an agency other than NR&M is the assessment ad ae Manager for the application, NR&M is a concurrence (ii) none of the above agency for the application in relation to this matter. Contaminated land 17. The application involves: (tick the applicable box/es) Applications involving material change of use and / 7 7 ji it i: - of reconfiguting aot may tigger lis referral, Ow reconfiguring @ fot for which all of part of the premises are For more information refer fo Guide §. (a) premises mentioned in the IPA, schedule 8, part 1, table 2 - Unless you answered ‘none of the above" to Q17, « item 5, including the exemption otherwise provided for by paragraph (d); the application requires assessment by the « item 6, including the exemption otherwise provided for by paragraph (e); or Environmental Protection Agency (EPA). If an P ‘ ; i : ided f ai ii ) ‘agency other than EPA is the assessment manager * item 4, including the exemption otherwise provided for a mining activity or petroleum for the application, EPA will be a concurrence activity; or agency for the application in elation fo this matter. b) in an area for which an area management advice has been given for unexploded 9 g p ordnance - complete Part N of Form 1 LD (ii) a material change of use - (a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or (b) assessable against the planning scheme and if all or part of the premises is in an area for which an area management advice has been given for unexploded ordnance - complete Part N of Form 1 oi none of the above Electricity infrastructure 18. The application involves: (tick the applicable box/es) For more information refer to schedule 2of the IP Regulation. Untess you answered "none of the above" to 018, the application triggers referral to he agency to which the easement is granted in favour of as advice agency. C1) reconfiguring a fot where any part of the lot is - subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; or « situated within 100m of a substation site; a material change of use, assessable against a planning scheme and not associated with reconfiguring a lot if — any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; and « any structure or work that is the natural and ordinary consequence of the use is, or will be, located wholly or partly in the easement; a material change of use, assessable against a planning scheme and not associated with reconfiguring a lot if any part of the premises is situated within 100m of a substation site; LJ (iv) operational work that is filling or excavation assessable against the planning scheme, not associated with reconfiguring a lot, if - any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the work is located wholly or partly in the easement; the work is located wholly or partly within 10m of a substation site; none of the above. OG) Di of 24 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2291 - MCU Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.