Original source · versioned page text
Attachment E (i) - Maintenance Agreement (SW360 Quote) Part 1 of 2
Attached to the e-mail MCU14/0083 Response to Information Request.
Quotation – Maintenance Agreement
To: Projex Partners Date: 18 November 2014
Attention : Kai Pelgrave Page : 1 of 2
Phone : 0411 457 252
Email/Fax : [email protected]/
From : Fotos Melaisis
Subject/Ref : Stormwater360 - 5 year maintenance agreement at 05218 - 04813 - Gateway Drive,
Noosaville
Dear Kai,
In response to your recent inquiry, Stormwater360 is pleased to submit a quotation for a full Service on the
stormwater treatment system/s located at your facility.
Services Supplied By Stormwater360
Name Qty Monthly Price
4-Cartridge Manhole StormFilter (4c690SFMH.Q) 1.00
$275.00
Enviropod to suit up to 900 x 900 Pit (A1-5) 5.00
Maintenance agreement - Basic terms detailed below:
5 yr. agreement
StormFilter Service – 12 months
Enviropod Service – 4 months
General Exclusions
Regulated materials include but are not limited to: Pesticides, Herbicides, Insecticides, Solvents, Fuels, and
Strong Acids.
Inundation of system by Construction Site related Sediment.
Terms and conditions are located in the maintenance agreement.
NSW Office QLD Office Email: [email protected]
PO Box 792, Botany, NSW 1455 PO Box 4471 Forest Lake QLD 4078 IES Stormwater P/L trading as Stormwater 360
ABN: 79 101 258 182
Tel: 1300 354 722 Tel: 1300 354 722
Fax: 1300 971 566 Fax: 1300 971 566 www.stormwater360.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 1 page
Page 2
General Inclusions:
Traffic/ Pedestrian control.
Removal of sediment from vault.
Removal of sediment and gross pollutants from Enviropods
Removal of exhausted media from cartridges. (200kgs of sediment per cartridge additional disposal and
tipping fees are 30 cents/litre ($300/m3) +GST.)
Evaluation of cartridge components.
Freight of new cartridges to site.
Removal of old cartridges from vault.
Replacement of exhausted media in cartridges.
Installation of new cartridges in vault.
Freight of old cartridges back to SW360 & refurbishment of cartridges.
Tipping of waste materials and an approved waste disposal site.
Compliance Certificate
Availability:
Our current lead-time for the StormFilter Cartridges will be advised when your order is received by Stormwater360,
and design details and satisfactory financial arrangements are finalised.
Validity Period:
This quotation is valid for 30 days from the above date, and is then subject to confirmation. This quotation is
exclusive of any costs arising from the impact of the carbon pricing mechanism on Stormwater360 Australia or the
provision of the goods and/or services being the subject of this quote. Unless expressly excluded or superseded by a
signed agreement by the parties for the supply of the goods and/or services being the subject of this quote, this
condition shall prevail over any inconsistent or contrary term contained in a purchase order or other subsequent
documentation issued by either party in relation to the provision of goods and/or services being the subject of this
quote.
Intellectual Property and Copyright:
All information contained in our quotation, mechanical specifications, schedules, manuals and drawings remains the
property of Stormwater360, and shall not be disclosed or copied for a third party without the written permission of
Stormwater360.
Should Stormwater360 be unsuccessful with this offer, all technical data and drawings provided with our quotation,
and thereafter to support our offer, are to be returned to our office if so requested.
Please contact me if you have any further questions regarding this quotation.
Yours faithfully,
STORMWATER360
Fotos Melaisis
PH: 1300 354 722
FX: (02) 9525 5482
M: 0452 223 686
E: [email protected]
Stormwater360 | Quotation 2