Skip to the record
For the highest quality transcripts.

Council archive · source document

07/0256 - Representations Received [As Published] · 132007.256

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

>

Conditions 22-24

Conditions 22-24 have been superseded by the attached detailed plans. We request these be replaced with
the following condition -

The applicant shall upgrade the Rene Street - Eumundi Noosa Road roundabout and modify Gateway Drive
in accordance with the approved plans of development. Any works undertaken in this regard shall be offset
against the infrastructure charge (Advisory Note 2) for Coastal Major Road Network.

Condition 35
We request that condition 35 be deleted as there is no requirement to allocate car parking spaces to staff.
Condition 37

Condition 37 currently reads —

A new 3.0m wide concrete path shall be constructed along the Eumundi Noosa Road Street frontage of the
site and a new 2.0m wide concrete path shall be constructed along the new road and Gateway Drive frontage
of the site in accordance with Council's design standards and to an alignment that protects any significant
vegetation or any underground services.

Given that the 3.0m wide concrete path along Eumundi Noosa Road is identified in Council's infrastructure
policies as a trunk pathway, we request that this condition reflect that the construction of such infrastructure
be offset against PSP20 - Pathway Trunk Network Contributions. Our suggested wording for the condition is

A new 3.0m wide concrete path shall be constructed along the Eumundi Noosa Road Street frontage of the
site and a new 2.0m wide concrete path shall be constructed along the new road and Gateway Drive frontage
of the site in accordance with Council's design standards and to an alignment that protects any significant
vegetation or any underground services. The construction works along Eumundi Noosa Road street frontage
is to be offset against contributions made under PSP20 - Pathway Trunk Network Contributions.

Condition 41
Condition 41 currently reads -

The developer shall provide a safe connection (minimum width 2.5 metres) for pedestrians and cyclists from
Eumundi Noosa Road and Gateway Drive into the development site and include any necessary pedestrian
refuges or crossings required. The alignment shall ensure that appropriate path design standards can be
met and pedestrians and cyclists have safe passage through the car park area to the customer and staff
entrances.

The intent of this condition is clearly understood, however, given the topography of the site it is not possible to
achieve the requirements of the condition in its current form. We have considered the functional
requirements and advise the following -

® — Bicycle access to the site is available from the Gateway Drive frontage along the proposed footpath
and also by way of the road network.

= Pedestrian access to the site is now provided from both street accesses as identified on the
attached revised plans. This access has been provided to achieve the best possible access to the
front door of the store, working in conjunction with the ‘shared zone’ concepts for car parks

Page-4- employed by all Bunnings Warehouse developments.

 

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0256 - Representations Received [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.