Council archive · source document
07/0256 - Representations Received [As Published] · 132007.256
> Conditions 22-24 Conditions 22-24 have been superseded by the attached detailed plans. We request these be replaced with the following condition - The applicant shall upgrade the Rene Street - Eumundi Noosa Road roundabout and modify Gateway Drive in accordance with the approved plans of development. Any works undertaken in this regard shall be offset against the infrastructure charge (Advisory Note 2) for Coastal Major Road Network. Condition 35 We request that condition 35 be deleted as there is no requirement to allocate car parking spaces to staff. Condition 37 Condition 37 currently reads — A new 3.0m wide concrete path shall be constructed along the Eumundi Noosa Road Street frontage of the site and a new 2.0m wide concrete path shall be constructed along the new road and Gateway Drive frontage of the site in accordance with Council's design standards and to an alignment that protects any significant vegetation or any underground services. Given that the 3.0m wide concrete path along Eumundi Noosa Road is identified in Council's infrastructure policies as a trunk pathway, we request that this condition reflect that the construction of such infrastructure be offset against PSP20 - Pathway Trunk Network Contributions. Our suggested wording for the condition is A new 3.0m wide concrete path shall be constructed along the Eumundi Noosa Road Street frontage of the site and a new 2.0m wide concrete path shall be constructed along the new road and Gateway Drive frontage of the site in accordance with Council's design standards and to an alignment that protects any significant vegetation or any underground services. The construction works along Eumundi Noosa Road street frontage is to be offset against contributions made under PSP20 - Pathway Trunk Network Contributions. Condition 41 Condition 41 currently reads - The developer shall provide a safe connection (minimum width 2.5 metres) for pedestrians and cyclists from Eumundi Noosa Road and Gateway Drive into the development site and include any necessary pedestrian refuges or crossings required. The alignment shall ensure that appropriate path design standards can be met and pedestrians and cyclists have safe passage through the car park area to the customer and staff entrances. The intent of this condition is clearly understood, however, given the topography of the site it is not possible to achieve the requirements of the condition in its current form. We have considered the functional requirements and advise the following - ® — Bicycle access to the site is available from the Gateway Drive frontage along the proposed footpath and also by way of the road network. = Pedestrian access to the site is now provided from both street accesses as identified on the attached revised plans. This access has been provided to achieve the best possible access to the front door of the store, working in conjunction with the ‘shared zone’ concepts for car parks Page-4- employed by all Bunnings Warehouse developments.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0256 - Representations Received [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.