07/0256 - Representations Received [As Published] · 132007.256
» Given the above, we request that condition 41 be revised to read — The developer shall provide a safe connection for pedestrians and cyclists from Eumundi Noosa Road and Gateway Drive into the development site as shown on the approved plans of development. Condition 46 Condition 46 currently reads — All stormwater drainage (including roof water overflow from the rainwater storage system) shall be collected and discharged so there is no net increase in stormwater runoff from the site. We request that condition 46 be reworded as below — All stormwater drainage (including roof water overflow from the rainwater storage system) shall be collected and discharged so there is no increase in the peak flow discharged from the site. Condition 52 Condition 52 currently reads - To ensure that polluted run-off does not enter Council's stormwater drainage system or the downstream ecosystem, stormwater run-off from the carparking areas and the driveways shall be treated in accordance with an approved Surface Water Management Plan. The Cardno Surface Water Management Plan dated 8 February 2008 shall be amended to reflect the conditions of this approval and the modified layout approved herein. It shall also ensure that there is a requirement for monitoring to be undertaken for a period of three years after the commencement of the use and the results submitted for Council for their records in digital form. The amended plan shall also include a method to effectively remove trash from the stormwater system. Rectification measures for non-compliance with water quality objectives shall be included in the Environmental Management Plan. Condition 52 requires that monitoring be undertaken for a period of three years. While it is possible to complete monitoring with respect to treatment measures with permanent water such as lakes, it is difficult to capture samples and obtain meaningful data when bio-retention systems are used. Firstly, the monitoring regime would necessarily be event based rather than being at intervals. Water quality samples for the pre-treatment case would need to be collected from water ponded in the bioretention systems. As the storage components of the system will provide for the capture of sediment and uptake of nutrients, some level of treatment will have occurred prior to the sample being collected. The water that is filtered through the bio-retention filter will take many hours to drain and then be conveyed via the drainage system to a point where sample collection could occur. Even then, the flow rate is likely to be low, making the collection of post treatment samples a time consuming exercise. It is considered that bio-retention systems are now relatively standard stormwater treatment devices with defined performance levels. It is therefore suggested that a bio-retention system designed in accordance with recognised guidelines such as the Healthy Waterways Water Sensitive Urban Design Technical Design Guidelines for South East Queensland will ensure that an appropriate level of treatment is achieved, The condition also requires that the stormwater plan submitted in support of the application be revised to include a suitable method to remove trash. It can be noted that each bioretention device allows for the storage and infiltration of low flows. The inverts of the field inlets to the drainage system will be set above the bed of each bio-retention system to allow for the drainage of higher flows. Therefore, all litter pgptained in runoff for the small events of interest in a water quality sense will be captured within the bio-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0256 - Representations Received [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.