RFI (rec. 5.06.26) 2567 - 18 Taylor Court, Cooroy - RFI Response Letter - 08.05.2026
Our Reference: 2567
8 May 2026
Noosa Shire Council
PO Box 141
Tewantin QLD 4565
Attention: Georgina Schramm
Dear Georgina,
RE: APPLICATION FOR A DEVELOPMENT PERMIT FOR RECONFIGURING A LOT,
MATERIAL CHANGE OF USE AND OPERATIONAL WORKS
DEVELOPMENT APPLICATION NO. MCU26/0019, OPW26/0038, RAL26/0007
18 TAYLORS COURT, COOROY
LOT 2 SP 197517
FOR RMD CAPITAL PTY LTD
INFORMATION REQUEST RESPONSE
In reference to the Information Request issued by Noosa Shire Council, dated 9 April
2026, we provide the following responses to the Civil Engineering items. The following
supporting documentation is attached to this response:
• Appendix A – Civil Engineering Drawings
• Appendix B – Site-Based Stormwater Management Plan (SBSMP) (Ver2)
• Appendix C – Waste Management Plan (WMP) (Ver2)
DOCUMENTATION
• Item 5 – Infrastructure Staging
Refer to revised drawings and documentation included in Appendices A, B & C.
A temporary AV loading bay is provided in Stage 1 at the location shown in the
drawings, and will act as a temporary AV bay until the completion of Stage 4.
The permanent AV loading bay will be delivered in Stage 4. See updated
drawings in Appendix A.
The proposed bioretention and detention basin is designed to suitably attenuate
and treat the entire developed (i.e. ultimate) catchment and is proposed to be
constructed with Stage 1 of the development.
2576 – 18 Taylor Court, Cooroy – RFI Response Letter – 08.05.2026 1
EA/TB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.