App C - Slope Stability - 14-16 Duke St · 132008.299.02
4. RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached.
4.1 Site Layout and Development Limitations
Should any revisions be made to the proposed extent of the development, as described in Section 1.1,
Tectonic must review these revisions prior to construction to assess if there are any impacts on slope
stability. To achieve a Low Risk of instability, the following is recommended:
All footings must found below the zone of influence of the existing structures and infrastructure
(including retaining walls).
All retaining walls exceeding 1 m high and/or subject to surcharge loads must be engineer designed
and certified by an RPEQ. The design must include an assessment of global and internal stability.
Design and construction of footings shall be undertaken in accordance with Section 4.3.
Formal drainage should be constructed to ensure all stormwater is directed away from the proposed
structures.
4.2 Earthworks
No earthworks details were available at the time of reporting; however, provided preliminary
architectural plans indicate that bulk excavations are not likely to exceed 1 m depth/height to form
finished levels. Deeper excavations may be required for underground footings and service trenches.
Should proposed cuts/fills exceed these quantities, Tectonic must assess the impacts on slope stability
prior to construction.
4.2.1 Site Preparation and Trafficability
Following removal of the existing structures, any relict construction elements, vegetation, tree stumps
and large roots should be stripped and ‘grubbed out’. Any organic rich topsoil should also be stripped
and removed from site. Organic topsoils and garden soils must not be re-used as structural fill; however,
small volumes may be retained on site for later use across landscaping areas, if required.
The natural subgrade following stripping will likely be in a loose condition. Should slab on ground
construction be proposed (e.g. concrete pathways) the ground surface should be compacted by several
passes of a vibrating plate compactor or small smooth drum roller (or similar) in conjunction with the
surface application of ample water.
Care must be taken with the use of any vibratory equipment to ensure that there are no adverse impacts
on surrounding structures and underground services (e.g. existing NC infrastructure along the site
boundaries). The impacts from ground vibration must be closely monitored and managed during
construction. Where significant vibrations are possible, it would be prudent to conduct a dilapidation
survey of neighbouring structures prior to commencement of construction.
4.2.2 Filling
The inferred sandy soils, where free of deleterious materials (e.g. building waste, organics etc.), may be
reused as structural fill, subject to appropriate moisture adjustment. Due to the possible presence of
deleterious materials in the upper soil profile from future demolition, a ‘skeleton bucket’ (or similar) may
be required to remove these materials prior to reuse.
21 October 2025
25317-001-Rev0 9 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App C - Slope Stability - 14-16 Duke St.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.