App C - Slope Stability - 14-16 Duke St · 132008.299.02
It should be noted that compaction of such sands as structural fill requires the addition of substantial volumes of water (‘flooding’) combined with the use of vibratory compaction equipment (typically a minimum 4 tonne vibrating smooth drum roller or vibrating plate) to achieve required compaction. Should importation of fill be required, it is recommended that such fill should comply with the following: Minimum CBR of 10% Maximum plasticity index of 15% Shrink-swell index ≤ 1% Maximum particle size of 100 mm Any fill should be compacted at moisture contents within the range of ±2% of optimum moisture content for Standard Compaction. Select fill should have a maximum particle size of 100 mm for an uncompacted layer thickness of 200 mm and shall be compacted by repeated rolling with a small compactor to achieve a dry density ratio of at least 95% of the Standard Maximum Dry Density for cohesive soils, or 70% Dry Density Index for any imported cohesionless soils. Confirmatory compaction testing should be carried out at regular intervals. A minimum of two tests per vertical lift is recommended where structural fill heights are to exceed 300 mm. Further details for control and testing of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for Commercial and Residential Developments. Fill embankment edges must be over-filled by 0.5 the width of the compaction equipment (horizontally) and then trimmed back to well compacted material. 4.2.3 Excavations Excavations through loose to medium dense sand should be achievable using conventional earthmoving plant (e.g. small or larger excavators with toothed buckets). Temporary, unsurcharged cuts could be formed at 1V:2H in the loose sand, and at 1V:1.5H in medium dense (or denser) sand, for batters up to 3 m in height (where room permits). Flatter batters or temporary retention would be required if groundwater seepage is encountered or if sloughing of dry sand occurs at the batter surface. Deeper unretained cuts, if required, should be specifically assessed by Tectonic, unless supported by temporary retention measures. Unless assessed and approved by a geotechnical RPEQ, all permanent cuts and fills must be retained. If the above temporary batter slopes cannot be achieved due to spatial restraints, temporary shoring will be required (e.g. sheet piles, contiguous piles etc.). Excavations in close proximity to existing structures/infrastructure will need to be specifically designed to prevent undermining. If undermining is a potential issue, the existing structures may need to be underpinned or the excavation may require temporary shoring. The advice of a suitably qualified and experienced structural RPEQ must be sought regarding any potential undermining and design and construction of any underpins/temporary shoring (if required). The above recommendations do not supersede any existing safety regulations or legislation applicable to excavations (e.g. limits on personnel entry into trenches). Due to the highly permeable nature of the sands at this site, stormwater is expected to rapidly infiltrate the ground making un-sealed surface drainage ineffective for the control of flows. Any sealed areas should be graded to ensure free drainage of stormwater away from construction areas to a control point(s). 21 October 2025 25317-001-Rev0 10 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App C - Slope Stability - 14-16 Duke St.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.