Attachment C -Substation Options

Attached to the e-mail Operational Works Application OPW19/0157 - Cover Letter - DA Form 1 - Sub Station Detail Sheet 1, 2 & 3 -Montage existing - Montage Proposed - Consultant Advice Notice - Tree Management Plan - The Esplanade Sunshine Beach.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                            PROJECT NAME         PROJ
NO
CONSULTANT ADVICE NOTICE                                                                     ELEC-CAN-001 R1
Substation Location Options
Ashley,
Following our initial consolation with Energex, it was identified that a new transformer was required to supply
the site. Two options for the type and location of this transformer were identified.
     •    Option 1 - Pole Mounted transformer on a new service pole located on Webb road
     •    Option 2 - Kiosk transformer adjacent to the public amenities on Webb road.
Energex has indicated that the preferred supply option is Option 1.
Site Plan and HV availability
An investigation of the dial before you dig information and information available from site indicated that HV
was available only on the Webb road frontage. There is minimal in ground infrastructure, the majority of the LV
and HV cabling is reticulated overhead.
A review of the Dial before you dig indicates no significant infrastructure in the vicinity, with only limited
underground LV infrastructure on Duke St.




                                                                                                            Page 1 of 6
Log in to download the original file

Attachment C -Substation Options.pdf · 976 KB (small file)

Full text of the other 5 pages

Page 2

A review of site photos and street view indicates that the existing overhead high voltage follows the following
approximate alignment an existing pole mount transformer is located adjacent to the existing amenities.




Existing pole mounted transformer.




                                                                                                       Page 2 of 6

Page 3

Site Details
Following a review of the available connection points for high voltage, it was determined that a new service
connection along Webb St was the most practical.




Below is a street view photo of the proposed transformer location.




A review of the available information of the site has indicated the following:
    •   Access to the site is reasonable for construction equipment
    •   Any inground works, including footings, conduits etc, will impact the existing trees
    •   The existing overhead network will need to be reviewed and adjusted to suit the proposed works.
    •   The site is generally sloping from Webb St toward the park and the surf club.




                                                                                                       Page 3 of 6

Page 4

Option 1
Option 1 is a pole mounted transformer mounted on a new service pole. The consumer mains for the surf club
would run from the transformer to a property pole then transition to underground and run to the surf club.




 Advantages                                           Disadvantages
 Minimal inground works                               Visual impact for properties on Webb and Crank
                                                      street
 Potentially faster build/lead times                  Size of the pole mount transformer is limited, thus
                                                      restricting future spare capacity for the surf club
 Capital contribution for service pole less than      The existing street lighting will be affected by the
 padmount site                                        changes to the power poles. Evans Built responsible
                                                      for modifications to street lighting subject to council
                                                      approval.




                                                                                                     Page 4 of 6

Page 5

Option 2
Option 2 is a ground mounted padmount substation. A typical padmount substation site is 5m Deep x 4.8m
wide. Noting that the site is sloping an engineered retaining wall will be required.




 Advantages                                           Disadvantages
 Lower visual impact for properties on Webb and       In ground works more extensive, including impact on
 Crank street                                         adjoining trees
 Higher electrical spare capacity for the surf club   Contractor/client responsible for the civil works
                                                      associated with the padmount




                                                                                                 Page 5 of 6

Page 6

Required Works
From the point of supply the builder is required to install underground conduits to the surf club. These conduits
are to be coordinated with the existing services, trees etc and are to be protected by a service and access
easement.




                                                                                                       Page 6 of 6

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.