Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Attachment C -Substation Options

Attached to the e-mail Operational Works Application OPW19/0157 - Cover Letter - DA Form 1 - Sub Station Detail Sheet 1, 2 & 3 -Montage existing - Montage Proposed - Consultant Advice Notice - Tree Management Plan - The Esplanade Sunshine Beach.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

A review of site photos and street view indicates that the existing overhead high voltage follows the following
approximate alignment an existing pole mount transformer is located adjacent to the existing amenities.




Existing pole mounted transformer.




                                                                                                       Page 2 of 6
Log in to download the original file

Attachment C -Substation Options.pdf · 976 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.